Petrofac E&C International Limited
11. LETTRE OU TELEX EMIS PAR 11. LETTER OR TELEX ISSUED BY THE
L’ENTREPRENEUR DEMANDANT LA PRESENCE CONTRACTOR REQUESTING THE PRESENCE
DE L ‘INSPECTEUR DPEM POUR LES OF THE DPEM INSPECTOR FOR TESTS AND
EPREUVES ET CONTROLES EN USINE INSPECTIONS AT THE FABRICATOR SHOP
12. REPONSE ECRITE DE DPEM CONFIRMANT OU 12. WRITTEN REPLY FROM DPEM CONFIRMING
NON LA PRESENCE DE SON REPRESENTANT WHETHER OR NOT THE PRESENCE OF ITS
OU DE SON DELEGUE REPRESENTATIVE OR ITS DELEGATE
15. CERTIFICATS DES MATERIAUX AYANT SERVI 15. CERTIFICATES OF THE MATERIALS USED FOR
POUR L’ELABORATION DES PARTIES ET THE FABRICATION OF THE PARTS AND
PIECES DE L’APPAREIL (CARACTERISTIQUES SECTIONS OF THE EQUIPMENT (PHYSICAL
PHYSICO-CHIMIQUES) ET DES ELCTRODES. AND CHEMICAL CHARACTERISTICS) AND
ELECTRODES
16. RAPPORT DETAILLE DES CONTROLES NON 16. DETAILED REPORTS OF THE NON
DESTRUCTIFS EFFECTUES SUR LES DESTRUCTIVE EXAMINATION CARRIED OUT
SOUDURES OU SURFACE DES APPAREILS ON EQUIPMENT WELDS OR SURFACES
OU/ET LEURS ELEMENTS ET LES RAPPORTS AND/OR THEIR PARTS, PLUS REPORTS OF THE
DES CONTROLES DESTRUCTIFS EFFECTUES DESTRUCTIVE TESTING PERFORMED DURING
LORS DE LA FABRICATION. THE FABRICATION.
21. PLAQUE D’IDENTIFICATION POUR APPAREIL A 21. NAME PLATE FOR PRESSURE EQUIPMENT
PRESSION
23. PLAQUE POUR LES ÉCHANGEURS THERMIQUES 23. PRO-FORMA NAME PLATE FOR HEAT EXCHANGERS
DOCUMENT No. 2 DOCUMENT No. 2
SECTION PAGE
A. RATED DATA 2
B. STANDARDS 2
C. OTHER PERFORMANCE DATA 2
D. SITE CONDITIONS 3
F. INSTALLATION DATA 4
G. INCLUDED ACCESSORIES 5
H. WORKSHOP TESTS 8
ENCLOSURE NUMBER
PAGE
- GENERATOR OUTPUT VS. COOLING AIR TEMP. 1
- EFFICIENCY CURVES 2
- SATURATION CURVES - A 3
- V-CURVES 4
- CAPABILITY DIAGRAM 5
Project: M.A214.01 A
PO. IM0002 A
AE059316
No. of sh.
Prep. AP/MAE P.S 2008-06-04 Technical Specification
Appr. / Sjöberg Lars G 15/01/2009 BP In Salah 3rd Unit 9
Resp.
dept.
AP/MA L001071-A1
Document number Lang. Rev. ind. Sheet
A. RATED DATA
at cooling air temperature 40 oC
B. STANDARDS
Reactances:
- Xd (±15%) % : 163
- Xd' unsat/sat " % : 34.1 / 29.3
- Xd" unsat/sat " % : 23.5 / 20.0
- X0 % : 9.6
- X2 % : 23.5
Time constants:
- Td' s : 1.04
- Td" s : 0.027
- Td0' s : 6.74
- Ta s : 0.19
D. SITE CONDITIONS
F. INSTALLATION DATA
Heat losses:
- Cooling air kW : 447 ( at rated load )
- Lubrication oil kW : 31.2
Sleeve bearings:
- Max. axial play towards D-end mm : 12.0
- Max. axial play towards N-end mm : 12.0
- Max. permissible axial thrust kN : 0
- Min. barring speed rpm : 45
- Required oil flow to bearings (Total) l/min : 49.0
- Oil temperature range to bearings °C : 40 - 65
- Required oil pressure at 40 °C kPa : 150
At higher pressure an orifice should be used.
- Supply oil pressure kPa : 150
- Type of oil : ISO VG 46
- Degree of purity for oil : 17/15/12 acc. to ISO 4406:1999
Weights:
- Total (complete machine, excluding terminal box) kg : 73000
- Stator kg : 27150
- Rotor kg : 21250
- Terminal box kg : 1700 B
G. INCLUDED ACCESSORIES
Exciter
Main brushless exciter type GLA for DC excitation
complete with diode bridge, thyristors, RC-circuits
and control box.
Foundation details
Machine provided with 8 feet.
Bearings
Sleeve bearings suitable for flood oil lubrication
provided by others.
Connection at common point at side of machine.
Main terminal
Heaters in HV terminal box.
Large stator terminal box, left side.
Stator terminal box protection IP55 with all 12
ends brought out and neutral point terminated
inside the box. Connection from underneath.
Grounding clamps inside and outside.
Line side
Neutral side
Anticondensation heaters
"Black heat" anti condensation heaters.
In both main machine, exciter and terminal box.
Bonding
Noise damping
Silencer at the air-air heat exchanger.
Surface treatment
According Paint spec UK600-5006 offshore
H. WORKSHOP TESTS
Witnessing of testing
2220
MAX ELEMENT TEMP RISE 1000°C
HV CABLEBOX
1930
ELEMENT TYPE EDGEWOUND 'RP' TYPE
BOLTED REMOVABLE
ELEMENT MATERIAL STAINLESS STEEL ALLOY
COVER
APPROX UNIT WEIGHT 775kg
1480
CABLE ENTRY VIA
B UNDRILLED B
835
ALUMINIUM
GLAND PLATE
465
M12 EARTH BUSHING
1.2kV / 30kV BIL A A
C C
A-A
1742
1677
NER
CABLE
428 TOLERANCE:- +/- 0.5 mm (UOS) A3 DRAWING TITLE
D 36 1542 DIMENSIONS IN mm (UOS) 10kV NEUTRAL EARTHING D
NEUTRAL EARTHING RESISTOR 1614 TEL:(+44)(0)1162733633 RESISTOR ARRANGEMENT
WIRING DIAGRAM FAX:(+44)(0)1162737911
B UPDATED TO COMMENTS 08/09/2008 HB Evington Valley Road, email:sales@cressall.com DRAWING.No. SHEET ISS
A 1ST ISSUE 26/08/2008 HB Leicester.LE5 5LZ http//www.cressall.com
ZONE ISSUE ECN DESCRIPTION DATE DRAWN APPROVE
UK.
© Cressall Resistors Ltd. 2008
111563 1 of 1 B
1 2 3 4 5 6
ABB Automation Technology Products Record Prep.: MA Per-Erik Lindh
Title: Shaft displacement GBA-machine Date: 2008-08-13
L1
L2 L3
ND-END A B D-END
Y Y Y
X Z X
B-B A B
A-A
CL MACHINE
A A
1 List of contents
2 Line side connection
3 Voltage transformers
4 Generator
C 5 Neutral point side connections C
6 Heaters
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
E E
L2
A A
L3
+MTB +MTB.GC
W
V
U
Earthing balls
‐X1
B ‐1 7 B
‐E1 1001
8
‐2 9
‐E2 1002
10
Rogowski
‐3 11
Coil
‐E3 1003
12
P1 P1 P1 ‐X1
52
C 53 C
13
disclosure to third parties without express authority
14
We reserve all rights in this document and in the
2500/1A
20VA Cl.0,5 FS5 ‐CT4 ‐CT5 ‐CT6 15 I1NE
3BSY 200 400‐FMD/33.A1
1s2 1s2 1s2 16 I1L1 Auto Voltage
3BSY 200 400‐FMD/33.A1
17 I1L2 Regulator
3BSY 200 400‐FMD/33.A1 AVR
18 I1L3
is strictly forbidden. © ABB
>/3.A2
>/3.A2
>/3.A1
>/2.E2
>/2.E1
>/2.E1
A +MTB.GC A
V1
W1
U1
‐VT1 a
A
n
10 kV 110V 110V da
√3 √3 3 N
30VA Cl 0.5
B dn B
100VA Cl 3P
‐VT2 a
A
n
‐X11
da 5 MCB_PT_T1_1
N 3BSY 200 400‐FMD/16.C2
11 ‐F1 14 6 MCB_PT_T1_2
3BSY 200 400‐FMD/16.C2
dn 12 7
‐VT3 a 1 2 1 U1L1 Auto Voltage
3BSY 200 400‐FMD/33.B1
3 4 2 U1L2 Regulator AVR
A 3BSY 200 400‐FMD/33.B1
Synchronizing
n 5 6 3 U1L3
3BSY 200 400‐FMD/33.B1
C da 6A K 4 U1NE C
N I>/ 3BSY 200 400‐FMD/33.B1
disclosure to third parties without express authority
dn
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
‐X12
5 MCB_PT_T2_1
3BSY 200 400‐FMD/16.C2
11 ‐F2 14 6 MCB_PT_T2_2
3BSY 200 400‐FMD/16.C2
is strictly forbidden. © ABB
12 7
1 2 1 U2L1
3BSY 200 400‐FMD/52.C2
3 4 2 U2L2 Generator
3BSY 200 400‐FMD/52.C2
5 6 3 U2L3 Protection
3BSY 200 400‐FMD/52.C2
D 6A K 4 U2NE D
I>/ 3BSY 200 400‐FMD/52.D2
‐X13
5
11 ‐F3 14 6
12 7
1 2 1 Uda
3BSY 200 400‐FMD/52.D2 Generator
2 Udn
6A K I>/ 3BSY 200 400‐FMD/52.D2 Protection
E E
2
‐R10
W1
1
V1
U1
>/4.A1
>/4.A2
>/4.A2
>/3.E2
>/3.E2
>/3.E1
‐X1
3
‐F1
V1
W1
U1
11 14 4
12 5 MCB_PMG_T1_2
3BSY 200 400‐FMD/16.B1
6 MCB_PMG_T1_1
3BSY 200 400‐FMD/16.B1
Clockwise rotation A1 1 2 1 A1
3BSY 200 400‐FMD/12.B1
Faceing D‐end A2 3 4 2 A2
phase sequence U, V, W 3BSY 200 400‐FMD/12.B1
PMG I>/
B B
F1 F1
3BSY 200 400‐FMD/12.E1
GS
‐GEN
25375 kVA F2 F2
3BSY 200 400‐FMD/12.E1
10kV±5%, 50 Hz
1465A EXCITER
PF=0.80
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
D D
E E
W2
V2
U2
/5.A2
/5.A2
/5.A1
>/4.E2
>/4.E2
>/4.E1
+MTB +MTB.GC
A A
V2
W2
U2
P2 P2 P2 ‐X2
11
12
13
2500/1A 3s2 3s2 3s2 14
20VA 5P20 ‐CT1 ‐CT2 ‐CT3 15
3s1 3s1 3s1
16
17
B 18 B
‐X2
21
22
23
2s2 2s2 2s2 24
2500/1A ‐CT1 ‐CT2 ‐CT3 25 I2NE
20VA 5P20 2s1 2s1 2s1 3BSY 200 400‐FMD/62.B1
26 I2L1 Generator
3BSY 200 400‐FMD/62.A1
27 I2L2 Protection
3BSY 200 400‐FMD/62.A1
28 I2L3
3BSY 200 400‐FMD/62.B1
‐X2
C 31 C
32
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
33
2500/1A 1s2 1s2 1s2 34
Cl. X ‐CT1 ‐CT2 ‐CT3 35 I3NE
1s1 1s1 1s1 3BSY 200 400‐FMD/52.B2 Generator
36 I3L1
3BSY 200 400‐FMD/52.A2 Differential
is strictly forbidden. © ABB
37 I3L2 Protection
P1 P1 P1 3BSY 200 400‐FMD/52.A2
38 I3L3
3BSY 200 400‐FMD/52.B2
V2
W2
U2
‐X2
D s2 41 I4NE1 Generator E/F
D
750/1A ‐CT11 3BSY 200 400‐FMD/62.C1
10VA 5P10 s1 42 I4NE2 Protection
3BSY 200 400‐FMD/62.C1
E +NGR E
750A, 10s
60A cont.
‐R21
Based on Prepared Title Neutral point side connections External doc. id.
2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 5 6
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+GEN +MTB
A A
+GB
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
+MTB.GC
We reserve all rights in this document and in the
7HE2
7HE1
is strictly forbidden. © ABB
D D
4HE2
4HE1
2HE2
3HE2
5HE2
6HE2
7HE2
2HE1
3HE1
5HE1
6HE1
7HE1
1HE2
1HE1
Connected at site
E E
A A
Stator winding U Stator winding V Stator winding W Stator winding U Stator winding V Stator winding W
White
White
White
White
White
White
White
White
White
White
Red
Red
Red
Red
Red
Red
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
+GA
is strictly forbidden. © ABB
D D
4R2
4R2
2R2
2R2
3R2
3R2
4R1
5R2
5R2
6R2
6R2
1R2
1R2
2R1
3R1
5R1
6R1
1R1
E E
A A
Bearing RTD's
D‐End ND‐End
‐R13 ‐R14
B B
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
+GA
is strictly forbidden. © ABB
D D
13R4
13R4
14R2
14R2
14R3
14R4
14R4
13R2
13R2
13R3
14R1
13R1
E E
A A
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
+GA
is strictly forbidden. © ABB
D D
17R4
17R4
18R4
18R4
19R4
19R4
17R2
17R2
17R3
18R2
18R2
18R3
19R2
19R2
19R3
17R1
18R1
19R1
E E
A A
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
+GH
is strictly forbidden. © ABB
PE
PE
PE
2
3
4
5
6
7
8
9
1
D D
E E
A A
Vibration monitor
X Y X Y
ND‐End ND‐End D‐End D‐End
B B
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
+GA
com
com
com
com
out
out
out
out
VT
VT
VT
VT
D D
E E
A A
REVISION
Rev.ind. Page Description Date/Init.
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the
D D
E E
REPONSE ECRITE DE DPEM CONFIRMANT OU WRITTEN REPLY FORM DPEM CONFIRMING THE
NON LA PRESENCE DE SON REPRESENTANT OU ATTENDANCE OF ITS REPRESENTATIVE OR
DELEGUE DELEGATE
DOCUMENT No 13 DOCUMENT No 13
Not Applicable
DOCUMENT No 14 DOCUMENT No 14
Not Applicable
DOCUMENT No 15 DOCUMENT No 15
CERTIFICATS DES MATERIAUX AYANT SERVI CERTIFICATES OF MATERIALS USED FOR THE
POUR L’APPROBATON DES PARTIES ET PIECES APPROVAL OF THE EQUIPMENT PARTS AND
DE L’APPAREIL ET DES ELECTRODES SECTIONS AND ELECTRODES
We reserve all rights in this document and in the information contained therein. Reproduction,use or disclosure to third parties without express authority is strictly forbidden.
ABB AB; 2002
Item
on Description Supplier Certificate
ITP
ABB AB L001071D0068 en 1
DOCUMENT No 16 DOCUMENT No 16
RAPPORT DETAILLE DES CONTROLES NON DETAILED REPORTS OF THE NON DESTRUCTIVE
DESTRUCTIFS EFFECTUES SUR LES SOUDURES EXAMINATION CARRIED OUT ON EQUIPMENT
OU SURFACE DES APPAREILS OU/ET LEURS WELDS OR SURFACES AND/OR THEIR PARTS AND
ELEMENTS ET LES RAPPORTS DES CONTROLES REPORTS OF THE DESTRUCTIVE TESTING
DESTRUCTIFS EFFECTUES LORS DE LA PERFORMED DURING THE FABRICATION.
FABRICATION.
Not Applicable
DOCUMENT No 17 DOCUMENT No 17
Not Applicable
DOCUMENT No 18 DOCUMENT No 18
Not Applicable
DOCUMENT No 19 DOCUMENT No 19
Client Client or Supplier PO No. Date of Visit Date of Report Report No.
Delivery
Status Generator has been released for further processing – NOT including Packaging.
SUMMARY.
The inspector visited the premises of the manufacturer ABB AB Machines in Västeräs Sweden on 18-20.05.09
to carry out the Witness Inspection and Review Documentation on one Generator AMS 1250 LC and Accessories
Inspection and Documentation review was undertaken for Generator AMS 1250 LC and Accessories as per
Assignment Instruction required by Client Rolls Royce Energy Systems.
Results:
1. Review Documentation Satisfactory
2. Visual Inspection was performed and found acceptable to permit testing – See Comments.
3. Electrical tests performed on Generator AMS 1250 LC and Accessories were satisfactory,
Comments:
1. Minutes of Meeting (MOM) has been issued (Attached)
2. Punch list (Attached) was prepared by myself and Hemant Kashikar (the Client representative) for several
deficiencies and issued to ABB - action items will be verified during final inspection activities.
Remark:
1. Documents showed no stamp of approval of Rolls-Royce
Attendees:
2. Documentation used
Remark:
DETAILS
1. Inspection performed
Line side:
3xCT´s(3 cores), 3xVT´s(3 cores)
And 3 x Rogowski coils, one per phase
Earthing device 3 phase, ball-bolt
Neutral side:
3 x CT´s ( 3 cores) and 1x CT ( one Core)
Inspection steps acc. To ITP no. Doc. No. XYK 210 044-FMD, rev A
Item 101 – 106 Determinations based to the actual reached Test results
1.2 GCP
Inspection steps acc. To ITP no. Doc. No. 3BSY 200 420-FMD
3. Check of Documentation
Internal test Reports has been reviewed
Calibration Certificates has been reviewed
Documentation has to be completed.
Documentation has to be submitted to Rolls Royce for completion of MDR.
Complete MDR will be submitted from RR to Client
MOM and Punch list have been issued and signed by the participants.
Test records have been signed for acceptance.
Please see attachment.
Generator has been released for completion – but NOT released for packaging.
3. Summary:
• Generator serial no. 8268 123 has to be completed acc. to MOM and Punchlist.
Final Inspection will be made internally by ABB and Documented.
• Ready for transport is foreseen in week 22
• Main terminal box has to be completed acc. To MOM and Punchlist.
Final Inspection will be made internally by ABB and Documented.
• Neutral Earthing Resistor Box has to be completed acc. To MOM and Punchlist.
Final Inspection will be made internally by ABB and Documented.
• GCP has to be completed acc. To MOM and Punchlist.
Final Inspection will be made internally by ABB and Documented.
4. Attachments:
Remark: MOM and Punchlist is the first draft, final issues will follows