Vous êtes sur la page 1sur 266

DOSSIER REGLEMENTAIRE / REGULATORY DOSSIER

DIRECTION DE LA PROTECTION DU PATRIMOINE


ENERGITIQUE ET MINIER
DIRECTION OF ENERGY AND MINE PATRIMONY PROTECTION

MINISTERE DE L’ENERGIE ET DES MINES


MINISTRY OF ENERGY AND MINES

IN SALAH GAS

DESIGNATION DE L’EQUIPEMENT / EQUIPMET DESIGNATION

AC Generator

DOSSIER FINAL
FINAL DOSSIER

CONTRAT / CONTRACT
Petrofac E&C International Limited

RAISON SOCIALE OU FOURNISSEUR / COMPANY OR VENDOR


ABB Automation Technology
SOMMAIRE OUTLINE

00. PIECES No 2 A 9 DU DOSSIER D’ETUDE 01. ITEMS 2 TO 9 OF THE PRELIMINARY DESIGN


PRELIMINAIRE DOSSIER

10. LETTRE D’APPROBATON DU DOSSIER 10. APPROVAL LETTER OF THE PRELIMINARY


D’ETUDE PRELIMINAIRE EMISE PAR DPEM DESIGN DOSSIER ISSUED BY DPEM

11. LETTRE OU TELEX EMIS PAR 11. LETTER OR TELEX ISSUED BY THE
L’ENTREPRENEUR DEMANDANT LA PRESENCE CONTRACTOR REQUESTING THE PRESENCE
DE L ‘INSPECTEUR DPEM POUR LES OF THE DPEM INSPECTOR FOR TESTS AND
EPREUVES ET CONTROLES EN USINE INSPECTIONS AT THE FABRICATOR SHOP

12. REPONSE ECRITE DE DPEM CONFIRMANT OU 12. WRITTEN REPLY FROM DPEM CONFIRMING
NON LA PRESENCE DE SON REPRESENTANT WHETHER OR NOT THE PRESENCE OF ITS
OU DE SON DELEGUE REPRESENTATIVE OR ITS DELEGATE

13. CERTIFICAT D’HOMOLOGATION DES 13. QUALIFICATION CERTIFICATES OF THE


PROCEDURES DE SOUDAGE (PQR) WELDING PROCEDURES (PQR)

14. ATTESTATION DE QUALIFICATION DES 14. QUALIFICATION CERTIFICATES OF WELDERS


SOUDEURS ET OPERATEURS DE SOUDAGE OR WELDING OPERATORS (VALID AT THE
VALIDES A LA DATE DES OPERATIONS DE DATE OF THE WELDING OPERATIONS)
SOUDAGE

15. CERTIFICATS DES MATERIAUX AYANT SERVI 15. CERTIFICATES OF THE MATERIALS USED FOR
POUR L’ELABORATION DES PARTIES ET THE FABRICATION OF THE PARTS AND
PIECES DE L’APPAREIL (CARACTERISTIQUES SECTIONS OF THE EQUIPMENT (PHYSICAL
PHYSICO-CHIMIQUES) ET DES ELCTRODES. AND CHEMICAL CHARACTERISTICS) AND
ELECTRODES

16. RAPPORT DETAILLE DES CONTROLES NON 16. DETAILED REPORTS OF THE NON
DESTRUCTIFS EFFECTUES SUR LES DESTRUCTIVE EXAMINATION CARRIED OUT
SOUDURES OU SURFACE DES APPAREILS ON EQUIPMENT WELDS OR SURFACES
OU/ET LEURS ELEMENTS ET LES RAPPORTS AND/OR THEIR PARTS, PLUS REPORTS OF THE
DES CONTROLES DESTRUCTIFS EFFECTUES DESTRUCTIVE TESTING PERFORMED DURING
LORS DE LA FABRICATION. THE FABRICATION.

17. DIAGRAMME DES TRAITEMENTS THERMIQUES 17. THERMAL TREATMENT CHARTS

18. CONDITIONS DES EPREUVES 18. HYDROTESTING CONDITIONS


HYDROSTATIQUES

19. CERTIFICAT D’INSPECTION DE VISITES 19. INTERNAL AND EXTERNAL INSPECTION


INTERNES ET EXTERNES CERTIFICATES

20. CERTIFCAT D’EPREUVE HYDROSTATIQUE 20. HYDROTESTING CERTIFICATE

21. PLAQUE D’IDENTIFICATION POUR APPAREIL A 21. NAME PLATE FOR PRESSURE EQUIPMENT
PRESSION

22. CERTIFICAT D’ESSAI 22. TEST CERTIFICATE

23. PLAQUE POUR LES ÉCHANGEURS THERMIQUES 23. PRO-FORMA NAME PLATE FOR HEAT EXCHANGERS
DOCUMENT No. 2 DOCUMENT No. 2

CERTIFICATION PAR LA CHAMBRE DE CERTIFICATION BY THE CHAMBER OF COMERCE


COMMERCE DES SIGNATURES DU FABRICANT – OF THE FABRICATOR SIGNATURES – ALGERIAN
VISA DU CONSULAT ALGERIEN CONSULATE STAMP
DOCUMENT No 3 DOCUMENT No 3

CERTIFICAT DE CONFORMITE ET DE VISITES CERTIFICATE OF CONFORMITY AND OF INTERNAL


INTERIEURES ET EXTERIEURES AND EXTERNAL INSPECTIONS
DOCUMENT No. 5 DOCUMENT No. 5

NOTES DE CALCUL DESIGN CALCULATIONS


We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.  ABB

TECHNICAL SPECIFICATION FOR BRUSHLESS SYNCHRONOUS GENERATOR

CLIENT : Rolls Royce


PROJECT : BP In Salah 3rd Unit
TYPE : AMS 1250LC
OUR REFERENCE : L001071-A1
DRIVEN BY : Gas Turbine RB211
DATE : 2008-06-04
___________________________________________________

SECTION PAGE

A. RATED DATA 2
B. STANDARDS 2
C. OTHER PERFORMANCE DATA 2
D. SITE CONDITIONS 3
F. INSTALLATION DATA 4
G. INCLUDED ACCESSORIES 5
H. WORKSHOP TESTS 8

ENCLOSURE NUMBER

INSPECTION PLAN XYK 210 044-FMD

GENERATOR CURVES : XYK 210 094-FMD

PAGE
- GENERATOR OUTPUT VS. COOLING AIR TEMP. 1
- EFFICIENCY CURVES 2
- SATURATION CURVES - A 3
- V-CURVES 4
- CAPABILITY DIAGRAM 5

SHORT CIRCUIT EQUATIONS XYK 210 089-FMD

Project: M.A214.01 A
PO. IM0002 A

AE059316
No. of sh.
Prep. AP/MAE P.S 2008-06-04 Technical Specification
Appr. / Sjöberg Lars G 15/01/2009 BP In Salah 3rd Unit 9
Resp.
dept.
AP/MA L001071-A1
Document number Lang. Rev. ind. Sheet

ABB AB, Machines XYK210045-FMD en B 1


TEMPLATE: NORMAL.DOT; PRINTDATE: 1/15/2009 2:37:00 PM; SAVEDATE: 1/15/2009 12:44:00 PM; OSKAR VERSION: 3.48 (2008-03-17)
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.  ABB

A. RATED DATA
at cooling air temperature 40 oC

Output kVA : 25375


Power factor ( overexcited ) : 0.80
Voltage V (±5%) : 10000
Frequency Hz (±2%) : 50
Speed r/min : 1500
Current A : 1465
Exciter type : GLA 600D
Excitation V/A : 69 / 12

B. STANDARDS

Applicable standards : IEC 60034-1


Insulation class stator and exciter : F
Insulation class main rotor : H
Temperature rise, stator within class : B total temperature
Temperature rise, rotor within class : B total temperature

C. OTHER PERFORMANCE DATA


Note: The losses from the fan motors, 15 kW, are included in the efficiency.

Efficiency at P.F. 0.80 and


100 / 75 / 50 / 25 % load % : 97.85 97.65 97.06 94.96
Efficiency at P.F. 1.00 and
100 / 75 / 50 / 25 % load % : 98.37 98.21 97.73 96.01

Reactances:
- Xd (±15%) % : 163
- Xd' unsat/sat " % : 34.1 / 29.3
- Xd" unsat/sat " % : 23.5 / 20.0
- X0 % : 9.6
- X2 % : 23.5

Time constants:
- Td' s : 1.04
- Td" s : 0.027
- Td0' s : 6.74
- Ta s : 0.19

Excitation main machine:


- voltage no load V : 61
- voltage full load V : 144
- current no load A : 210
- current full load A : 491

Document number Lang. Rev. ind. Sheet

ABB AB, Machines XYK210045-FMD en B 2


TEMPLATE: NORMAL.DOT; PRINTDATE: 1/15/2009 2:37:00 PM; SAVEDATE: 1/15/2009 12:44:00 PM; OSKAR VERSION: 3.48 (2008-03-17)
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.  ABB

Sudden short circuit current (peak) kA : 21


Short circuit ratio % : 63

Max. field forcing for 10 seconds


(percentage of rated excitation) % : 203
Sustained short circuit, stator current for 10 seconds
at symetrical conditions % : 300

Max. permissible overspeed r/min : 1800

Max. continuous negative sequence current % : 8


Fault condition capability (I2/IN)2t s : 20

D. SITE CONDITIONS

Ambient temperature range °C : 0 - +55


Altitude m : < 1000
Location : Outdoors
Hazardous area classification : Non hazardous area

Document number Lang. Rev. ind. Sheet

ABB AB, Machines XYK210045-FMD en B 3


TEMPLATE: NORMAL.DOT; PRINTDATE: 1/15/2009 2:37:00 PM; SAVEDATE: 1/15/2009 12:44:00 PM; OSKAR VERSION: 3.48 (2008-03-17)
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.  ABB

F. INSTALLATION DATA

Protection form/cooling form : IP55 IC6 A1A6

Heat losses:
- Cooling air kW : 447 ( at rated load )
- Lubrication oil kW : 31.2

Arrangement form : IM 1005

Sleeve bearings:
- Max. axial play towards D-end mm : 12.0
- Max. axial play towards N-end mm : 12.0
- Max. permissible axial thrust kN : 0
- Min. barring speed rpm : 45
- Required oil flow to bearings (Total) l/min : 49.0
- Oil temperature range to bearings °C : 40 - 65
- Required oil pressure at 40 °C kPa : 150
At higher pressure an orifice should be used.
- Supply oil pressure kPa : 150
- Type of oil : ISO VG 46
- Degree of purity for oil : 17/15/12 acc. to ISO 4406:1999

Weights:
- Total (complete machine, excluding terminal box) kg : 73000
- Stator kg : 27150
- Rotor kg : 21250
- Terminal box kg : 1700 B

Rotor inertia (J=m*rm2) kgm2 : 3406

Direction of rotation (at drive end, facing shaft end) : CLOCKWISE

First lateral critical speed (based on stiff foundation) r/min : 1800

Noise level (at 1m acc.to ISO 3744) dB(A) : 82 , Tol. +3 dB(A)

Static force on each machine foot kN : 90


Dynamic force on each machine foot kN : ±189

Auxiliary equipment power supply:


- Anticondensation heaters in the main machine V, ph, W : 230, 1, 5 x 400
- Anticondensation heater in the exciter V, ph, W : 230, 1, 400
- Anticondensation heater in main terminal box V, ph, W : 230, 1, 400
- Separate fan motors for external cooling air V, ph, kW : 400, 3, 15 (for two motors)(3 x 50%)

Document number Lang. Rev. ind. Sheet

ABB AB, Machines XYK210045-FMD en B 4


TEMPLATE: NORMAL.DOT; PRINTDATE: 1/15/2009 2:37:00 PM; SAVEDATE: 1/15/2009 12:44:00 PM; OSKAR VERSION: 3.48 (2008-03-17)
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.  ABB

G. INCLUDED ACCESSORIES

Cooling arrangement IC6 A1A6


Self circulated inner air circuit cooled by built-on
air-air heat exchanger. External air stream provided
by separate fans, normally two fans of three service.

Protection form IP55.

Exciter
Main brushless exciter type GLA for DC excitation
complete with diode bridge, thyristors, RC-circuits
and control box.

Pilot Exciter (PMG) single phase type.


MCB - PMG over current protection: 20 A.

Mounting arrangement IM 1005


Horizontal machine with two bearings,
one shaft extension.

DE shaft end forged flange.

Foundation details
Machine provided with 8 feet.

Mounting kit for steel foundation including:


1 set of laminated stainless steel shims 10 mm.
Holding down bolts and dowel pins.

No alignment or grouting included in ABB scope of supply.

Jacking bolts vertical adjustment.

Bearings
Sleeve bearings suitable for flood oil lubrication
provided by others.
Connection at common point at side of machine.

The lube oil drain pressure must be less than or


equal to the machine ambient pressure.
An oil drain pressure of 200-1000 Pa lower than
the bearing ambient is recommended.

Customer connection flange acc. to ANSI B16.5, Cl.150.


Raised face type 316 series SS. B

Inlet pipe in stainless steel connection at the left hand side.


Outlet pipe in stainless steel connection at the right hand side.

Orifice for pressure reduction.

Document number Lang. Rev. ind. Sheet

ABB AB, Machines XYK210045-FMD en B 5


TEMPLATE: NORMAL.DOT; PRINTDATE: 1/15/2009 2:37:00 PM; SAVEDATE: 1/15/2009 12:44:00 PM; OSKAR VERSION: 3.48 (2008-03-17)
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.  ABB

Provision for jacking oil.


Emergency oil requirement

Main terminal
Heaters in HV terminal box.
Large stator terminal box, left side.
Stator terminal box protection IP55 with all 12
ends brought out and neutral point terminated
inside the box. Connection from underneath.
Grounding clamps inside and outside.

The main terminal box is delivered as a loose item,


assembly on site is not included in ABB's scope of supply.

The main terminal box needs to be supported from beneath.


Supports are not included in ABB's scope of supply.
For terminal box weight see section F.

Line side

3 - Rogowski coils one per phase


3 - Voltage transformers
3 - Current transformers with 3 cores
1 - Earthing device 3 phase, ball-bolt.

Neutral side

3 - Current transformers with 3 cores


1 - Current transformer with single core

In separate enclosure IP54

1 - Neutral grounding resistor, 750 A for 10 sec. (7,7  )

Document number Lang. Rev. ind. Sheet

ABB AB, Machines XYK210045-FMD en B 6


TEMPLATE: NORMAL.DOT; PRINTDATE: 1/15/2009 2:37:00 PM; SAVEDATE: 1/15/2009 12:44:00 PM; OSKAR VERSION: 3.48 (2008-03-17)
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.  ABB

Anticondensation heaters
"Black heat" anti condensation heaters.
In both main machine, exciter and terminal box.

Termination in separate boxes (normally opposite


main supply side).

The anticondensation heaters should always be


connected during stand still.

Measurement and control


Resistance temperature detectors
All PT100 double elements (excl. stator) DIN.

6 in the stator winding


1 in each bearing
2 in cold air
1 in hot air

Surge protection,varistors, on RTD:s

Vibration control proximity type in two radial


planes, 90° apart
2 probes per bearing mounted outboard the bearing centerline
2 proximitors per bearing
including mounting and intercables.
Acceptance test for shaft run-out measurement is made in V-blocks.

Burnishing surface for proximity type of vibration probes,


maximum combined electrical and mechanical run out 22 µm (0.87 mils) peak-to-peak.

Flow control glass in oil outlet,


stainless steel, 1 per bearing.

Shaft grounding brush on D-end.

Bonding

SS 316 steel junction boxes IP 56. A

Noise damping
Silencer at the air-air heat exchanger.

Document number Lang. Rev. ind. Sheet

ABB AB, Machines XYK210045-FMD en B 7


TEMPLATE: NORMAL.DOT; PRINTDATE: 1/15/2009 2:37:00 PM; SAVEDATE: 1/15/2009 12:44:00 PM; OSKAR VERSION: 3.48 (2008-03-17)
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.  ABB

Surface treatment
According Paint spec UK600-5006 offshore

Primer coating - Zinc rich epoxy primer Interzinc 52 HS : 75 µm


Intermediate coating – epoxy intermediate coat Intergrade 475 HS: 2 x 100 µm
Finish coating - acrylic top coat Interfine 629 HS: 60 µm
Colour : 08B21 acc. to BS4800 A

H. WORKSHOP TESTS

ABB AB Machines standard procedure is to


perform a type test for a single machine order. If two or
more identical machines are ordered, then a type test is
performed on the first machine and routine tests on the
remaining machines.

Proposed workshop tests according to enclosed


INSPECTION PLAN are part of our manufacturing
program and are part of the quoted price of the machine.

Witnessing of testing

Participation in a test specially arranged, time to be agreed between


ABB AB Machines and customer, 2 weeks advance notice,
date will be confirmed 1 week prior to scheduled test date.
The performance calculations are carried out and presented
to customer during his visit.

Document number Lang. Rev. ind. Sheet

ABB AB, Machines XYK210045-FMD en B 8


TEMPLATE: NORMAL.DOT; PRINTDATE: 1/15/2009 2:37:00 PM; SAVEDATE: 1/15/2009 12:44:00 PM; OSKAR VERSION: 3.48 (2008-03-17)
DOCUMENT No. 6 DOCUMENT No. 6

PLANS DETAILLES AVEC INDEX DETAILED DRAWINGS WITH INDEX


1 2 3 4 5 6
ENCLOSURE MATERIAL INCLINED CANOPY TO
FRAME: 2mm THICK STAINLESS STEEL 304 PREVENT WATER BUILD UP 1866
COVERS: 1.5mm THICK STAINLESS STEEL 304 1721
AIR VENT WITH
FINISH: NATURAL IP54 FILTER MESH
(REPLACEABLE)
DEGREE OF PROTECTION
EXTERNAL SKIN
A RESISTOR ENCLOSURE INGRESS (IEC60529) IP23 A
CABLEBOX INGRESS (IEC60529) IP54 BOLTED REMOVABLE
EXTERNAL SKIN INGRESS (IEC60529) IP54 COVERS
ELECTRICAL (IEC60071) 125kV BIL (GRADED TO EARTH) M12 NEUTRAL BUSHING
24kV/ 125kV BIL
TECHNICAL DATA
RATED SYSTEM VOLTAGE 10000V
RATED VOLTAGE 5775V STAINLESS STEEL
RATED CURRENT 750A RATING PLATE
RATED TIME 10 seconds
CONTIUNOUS CURRENT 60A
RESISTANCE AT 25°C 7.7 Ohms (±10%)

2220
MAX ELEMENT TEMP RISE 1000°C
HV CABLEBOX

1930
ELEMENT TYPE EDGEWOUND 'RP' TYPE
BOLTED REMOVABLE
ELEMENT MATERIAL STAINLESS STEEL ALLOY
COVER
APPROX UNIT WEIGHT 775kg

1480
CABLE ENTRY VIA
B UNDRILLED B

835
ALUMINIUM
GLAND PLATE

465
M12 EARTH BUSHING
1.2kV / 30kV BIL A A

230 2 x M12 FRAME EARTH 366


DIAGONALLY OPPOSITE
1150 527
EXTERNAL ENCLOSURE
INCOMING HAS A BASE PLATE FITTED
CABLE
AIR VENT WITH
4 x FIXING IP54 FILTER MESH
HOLES n16 (REPLACEABLE)

C C
A-A
1742

1677

NER

DRAWING TAG No. XYK 213 760-FMD


362,5

MATERIAL: WEIGHT: 775.0kg


FINISH: 1st CONTRACT: CR24231
OUTGOING
32,5

CABLE
428 TOLERANCE:- +/- 0.5 mm (UOS) A3 DRAWING TITLE
D 36 1542 DIMENSIONS IN mm (UOS) 10kV NEUTRAL EARTHING D
NEUTRAL EARTHING RESISTOR 1614 TEL:(+44)(0)1162733633 RESISTOR ARRANGEMENT
WIRING DIAGRAM FAX:(+44)(0)1162737911
B UPDATED TO COMMENTS 08/09/2008 HB Evington Valley Road, email:sales@cressall.com DRAWING.No. SHEET ISS
A 1ST ISSUE 26/08/2008 HB Leicester.LE5 5LZ http//www.cressall.com
ZONE ISSUE ECN DESCRIPTION DATE DRAWN APPROVE
UK.
© Cressall Resistors Ltd. 2008
111563 1 of 1 B
1 2 3 4 5 6
ABB Automation Technology Products Record Prep.: MA Per-Erik Lindh
Title: Shaft displacement GBA-machine Date: 2008-08-13

L1

L2 L3

ND-END A B D-END

Y Y Y

X Z X

B-B A B
A-A
CL MACHINE

THERMAL EXPANSION SHAFT DISPLACEMENT


FOR THE CALCULATION OF THE
COLD OPERATION A-A B-B
TOTAL SHAFT DISPLACEMENT
20oC / 68oF 65oC / 149oF X Y X Y IT IS ASSUMED THAT IN COLD
L1 DISPLACEMENT DUE TO CONDITIONS THE SHAFT LIE IN
L2 2400 2401.296 THERMAL EXPANSION 0.000 0.305 0.000 0.305 THE BOTTOM OF THE BEARINGS.
L3 DISPLACEMENT DUE TO
ROTATION 0.077 0.096 0.077 0.098
TOTAL DISPLACEMENT
0.077 0.401 0.077 0.403

DIRECTION OF ROTATION (FACING DRIVE END): CLOCKWISE

Project:BP In Salah 3rd Unit Doc. no.: XYK210097-FMD


Resp. dept.: MA Customer: Rolls Royce Lang.: en Rev. ind.:

Appr.: Proj. no.: L001071-A Sheet: 1 (1)


1 2 3 4 5 6 7 8

A A

Project name: BP In Salah 3rd Unit


Customer: ABB Inc., USA
B Project no: L001071 B

1 List of contents
2 Line side connection
3 Voltage transformers
4 Generator
C 5 Neutral point side connections C
6 Heaters
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

7 Temperature detectors in stator


8 Temperature detectors in bearings
9 Temperature detectors in air
is strictly forbidden. © ABB

10 Motor Cooling Fans


11 Vibration monitoring
D D
80 Revision Notes

E E

Based on Prepared Title Circuit diagram External doc. id.


2008‐06‐10 A Sarajlic
Approved List of contents Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 1 2
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1

L2
A A
L3

+MTB +MTB.GC

W
V
U
Earthing balls

‐X1
B ‐1 7 B
‐E1 1001
8
‐2 9
‐E2 1002
10
Rogowski
‐3 11
Coil
‐E3 1003
12

P1 P1 P1 ‐X1
52
C 53 C
13
disclosure to third parties without express authority

1s1 1s1 1s1


information contained therein. Reproduction, use or

14
We reserve all rights in this document and in the

2500/1A
20VA Cl.0,5 FS5 ‐CT4 ‐CT5 ‐CT6 15 I1NE
3BSY 200 400‐FMD/33.A1
1s2 1s2 1s2 16 I1L1 Auto Voltage
3BSY 200 400‐FMD/33.A1
17 I1L2 Regulator
3BSY 200 400‐FMD/33.A1 AVR
18 I1L3
is strictly forbidden. © ABB

3BSY 200 400‐FMD/33.A1


‐X1
21
22
23
D 2s1 2s1 2s1 24 D
2500/1A
20VA 5P20 ‐CT4 ‐CT5 ‐CT6 25
2s2 2s2 2s2 26
27
28
‐X1
31
32
33
2500/1A 3s1 3s1 3s1 34
20VA Cl.0,5 FS5 ‐CT4 ‐CT5 ‐CT6
E 35 E
3s2 3s2 3s2 36
37
P2 P2 P2
38
W1
V1
U1

>/3.A2

>/3.A2
>/3.A1

Based on Prepared Title Line side connection External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 2 3
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+MTB

>/2.E2
>/2.E1

>/2.E1
A +MTB.GC A

V1

W1
U1
‐VT1 a

A
n
10 kV 110V 110V da
√3 √3 3 N
30VA Cl 0.5
B dn B
100VA Cl 3P
‐VT2 a

A
n
‐X11
da 5 MCB_PT_T1_1
N 3BSY 200 400‐FMD/16.C2
11 ‐F1 14 6 MCB_PT_T1_2
3BSY 200 400‐FMD/16.C2
dn 12 7
‐VT3 a 1 2 1 U1L1 Auto Voltage
3BSY 200 400‐FMD/33.B1
3 4 2 U1L2 Regulator AVR
A 3BSY 200 400‐FMD/33.B1
Synchronizing
n 5 6 3 U1L3
3BSY 200 400‐FMD/33.B1
C da 6A K 4 U1NE C
N I>/ 3BSY 200 400‐FMD/33.B1
disclosure to third parties without express authority

dn
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

‐X12
5 MCB_PT_T2_1
3BSY 200 400‐FMD/16.C2
11 ‐F2 14 6 MCB_PT_T2_2
3BSY 200 400‐FMD/16.C2
is strictly forbidden. © ABB

12 7
1 2 1 U2L1
3BSY 200 400‐FMD/52.C2
3 4 2 U2L2 Generator
3BSY 200 400‐FMD/52.C2
5 6 3 U2L3 Protection
3BSY 200 400‐FMD/52.C2
D 6A K 4 U2NE D
I>/ 3BSY 200 400‐FMD/52.D2

‐X13
5
11 ‐F3 14 6
12 7
1 2 1 Uda
3BSY 200 400‐FMD/52.D2 Generator
2 Udn
6A K I>/ 3BSY 200 400‐FMD/52.D2 Protection
E E
2
‐R10
W1

1
V1
U1
>/4.A1

>/4.A2

>/4.A2

Based on Prepared Title Voltage transformers External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 3 4
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+GEN
Connection box
A +GF PMG and exciter A

>/3.E2

>/3.E2
>/3.E1
‐X1
3
‐F1

V1

W1
U1
11 14 4
12 5 MCB_PMG_T1_2
3BSY 200 400‐FMD/16.B1
6 MCB_PMG_T1_1
3BSY 200 400‐FMD/16.B1
Clockwise rotation A1 1 2 1 A1
3BSY 200 400‐FMD/12.B1
Faceing D‐end A2 3 4 2 A2
phase sequence U, V, W 3BSY 200 400‐FMD/12.B1
PMG I>/

B B
F1 F1
3BSY 200 400‐FMD/12.E1
GS
‐GEN
25375 kVA F2 F2
3BSY 200 400‐FMD/12.E1
10kV±5%, 50 Hz
1465A EXCITER
PF=0.80

C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

is strictly forbidden. © ABB

D D

E E
W2
V2
U2

/5.A2

/5.A2
/5.A1

Based on Prepared Title Generator External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 4 5
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

>/4.E2

>/4.E2
>/4.E1
+MTB +MTB.GC

A A

V2

W2
U2
P2 P2 P2 ‐X2
11
12
13
2500/1A 3s2 3s2 3s2 14
20VA 5P20 ‐CT1 ‐CT2 ‐CT3 15
3s1 3s1 3s1
16
17
B 18 B
‐X2
21
22
23
2s2 2s2 2s2 24
2500/1A ‐CT1 ‐CT2 ‐CT3 25 I2NE
20VA 5P20 2s1 2s1 2s1 3BSY 200 400‐FMD/62.B1
26 I2L1 Generator
3BSY 200 400‐FMD/62.A1
27 I2L2 Protection
3BSY 200 400‐FMD/62.A1
28 I2L3
3BSY 200 400‐FMD/62.B1
‐X2
C 31 C
32
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

33
2500/1A 1s2 1s2 1s2 34
Cl. X ‐CT1 ‐CT2 ‐CT3 35 I3NE
1s1 1s1 1s1 3BSY 200 400‐FMD/52.B2 Generator
36 I3L1
3BSY 200 400‐FMD/52.A2 Differential
is strictly forbidden. © ABB

37 I3L2 Protection
P1 P1 P1 3BSY 200 400‐FMD/52.A2
38 I3L3
3BSY 200 400‐FMD/52.B2
V2

W2
U2

‐X2
D s2 41 I4NE1 Generator E/F
D
750/1A ‐CT11 3BSY 200 400‐FMD/62.C1
10VA 5P10 s1 42 I4NE2 Protection
3BSY 200 400‐FMD/62.C1

E +NGR E

750A, 10s
60A cont.
‐R21

Based on Prepared Title Neutral point side connections External doc. id.
2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 5 6
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+GEN +MTB

A A

Heater in Stator Heater in Exciter Heater in terminal box

‐HE1 ‐HE2 ‐HE3 ‐HE4 ‐HE5 ‐HE7


‐HE6
1 2 1 2 1 2 1 2 1 2 1 2
1 2
400 W 400 W 400 W 400 W 400 W 400 W
B 400 W B

+GB
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or

+MTB.GC
We reserve all rights in this document and in the

7HE2
7HE1
is strictly forbidden. © ABB

D D
4HE2
4HE1

2HE2
3HE2

5HE2
6HE2
7HE2
2HE1
3HE1

5HE1
6HE1
7HE1

1HE2
1HE1

Connected at site

E E

230V, 50Hz, 2800W

Based on Prepared Title Heaters External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 6 7
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+GEN

A A

Stator winding U Stator winding V Stator winding W Stator winding U Stator winding V Stator winding W

‐R1 ‐R2 ‐R3 ‐R4 ‐R5 ‐R6


B B
White
White

White
White

White
White

White
White

White
White

White
White
Red

Red

Red

Red

Red

Red
C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

+GA
is strictly forbidden. © ABB

D D
4R2
4R2
2R2
2R2

3R2
3R2

4R1

5R2
5R2

6R2
6R2
1R2
1R2

2R1

3R1

5R1

6R1
1R1

E E

Based on Prepared Title Temperature detectors in stator External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 7 8
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+GEN

A A

Bearing RTD's

D‐End ND‐End

‐R13 ‐R14

B B

C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

+GA
is strictly forbidden. © ABB

D D
13R4
13R4

14R2
14R2

14R3
14R4
14R4
13R2
13R2

13R3

14R1
13R1

E E

Based on Prepared Title Temperature detectors in bearings External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 8 9
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+GEN

A A

Hot Air Cold Air ND‐End Cold Air D‐End

‐R17 ‐R18 ‐R19


B B

C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

+GA
is strictly forbidden. © ABB

D D
17R4
17R4

18R4
18R4

19R4
19R4
17R2
17R2

17R3

18R2
18R2

18R3

19R2
19R2

19R3
17R1

18R1

19R1

E E

Based on Prepared Title Temperature detectors in air External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 9 10
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+GEN

A A

Motor Cooling Fan1 Motor Cooling Fan2 Motor Cooling Fan3

B M ‐PE M ‐PE M ‐PE


B
‐M1 3 ‐M2 3 ‐M3 3
3x400V, 50Hz 3x400V, 50Hz 3x400V, 50Hz
18.5kW 18.5kW 18.5kW
U1 V1 W1 U1 V1 W1 U1 V1 W1

C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

+GH
is strictly forbidden. © ABB

PE

PE

PE
2
3

4
5
6

7
8
9
1

D D

E E

Based on Prepared Title Motor Cooling Fans External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 10 11
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+GEN

A A

Vibration monitor
X Y X Y
ND‐End ND‐End D‐End D‐End

‐B1 ‐B2 ‐B3 ‐B4

B B

C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

+GA

‐T1 ‐T2 ‐T3 ‐T4


is strictly forbidden. © ABB

com

com

com

com
out

out

out

out
VT

VT

VT

VT
D D

E E

Based on Prepared Title Vibration monitoring External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 11 80
D041_A3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
REVISION
Rev.ind. Page Description Date/Init.

A All Added Customer Ref. designation. 2008‐09‐11/AdSa


3 Updated Signal References.
B 2,3,5 Changed junction box item designation from +MTB.GC1/GC2 to +MTB.GC. 2008‐12‐03/AdSa
6 Changed junction box item designation from +GEN.GE to +GEN.GB and from +MTB.GC1 to +MTB.GC.
B 10 Added junction box +GEN.GH with terminals. Changed cooling fans power from 6.3kW to 18.5kW. B

C C
disclosure to third parties without express authority
information contained therein. Reproduction, use or
We reserve all rights in this document and in the

is strictly forbidden. © ABB

D D

E E

Based on Prepared Title Revision Notes External doc. id.


2008‐06‐10 A Sarajlic
Approved Ref. designation
F Customer ABB Inc., USA 2008‐12‐03 P‐E Lindh Project M.A214.01 In Salah PO.IM0002 F
Project no. Project name Work order id. Resp. (division/department) Released Document kind Document id. Rev. Lang. Page Cont.
L001071 BP In Salah 3rd Unit L001071‐A1 MAE Circuit diagram XYK 214 100‐FMD B en 80 1
D041_A3
1 2 3 4 5 6 7 8
DOCUMENT No. 7 DOCUMENT No. 7

SPECIFICATIONS DE PROCEDURES DE SOUDAGE WELDING PROCEDURE SPECIFICATIONS


(W.P.S) (WPS)
DOCUMENT No. 9 DOCUMENT No. 9

SPECIFICATIONS D’INSPECTION ET D’ESSAIS INSPECTION AND TESTING SPECIFICATIONS


DOCUMENT No 10
DOCUMENT No 10

LETTRE D’APPROBATION DU DOSSIER D’ETUDE APPROVAL LETTER OF THE PRELIMINARY DESIGN


PRELIMINAIRE EMISE PAR DPEM DOSSIER BY DPEM
DOCUMENT No 12 DOCUMENT No 12

REPONSE ECRITE DE DPEM CONFIRMANT OU WRITTEN REPLY FORM DPEM CONFIRMING THE
NON LA PRESENCE DE SON REPRESENTANT OU ATTENDANCE OF ITS REPRESENTATIVE OR
DELEGUE DELEGATE
DOCUMENT No 13 DOCUMENT No 13

CERTIFICATS D’HOMOLOGATION DES QUALIFICATION CERTIFICATES OF WELDING


PROCEDURES DE SOUDAGE (PQR) PROCEDURES (PQR)

Not Applicable
DOCUMENT No 14 DOCUMENT No 14

ATTESTATIONS DE QUALIFICATION DES QUALIFICATION CERTIFICATES OF WELDERS AND


SOUDEURS ET OPERATEURS DE SOUDAGE WELDING OPERATORS

Not Applicable
DOCUMENT No 15 DOCUMENT No 15

CERTIFICATS DES MATERIAUX AYANT SERVI CERTIFICATES OF MATERIALS USED FOR THE
POUR L’APPROBATON DES PARTIES ET PIECES APPROVAL OF THE EQUIPMENT PARTS AND
DE L’APPAREIL ET DES ELECTRODES SECTIONS AND ELECTRODES
We reserve all rights in this document and in the information contained therein. Reproduction,use or disclosure to third parties without express authority is strictly forbidden.
ABB AB; 2002

Index Material Certificate


Synchronous Generator AMS 1250LC
Generator Serial No. 8268 123, ABB ref. No.: L001071-A1

Item
on Description Supplier Certificate
ITP

Material check of blank for Scana Steel Björneborg


60 08, 1784
rotor body AB, Sweden
Charge No.:22787/643629-1
558513
Material check of blank to
61 Stena Stål AB, Sweden Charge No.:22314/633825-1
pole tips
558738
18247
Material check of electrical
62 Cogent, Sweden No. 35791
plate of stator core
Certificate for Pilot Exciter EVZ-VUES Brno s.r.o,
63 Serial No. 650416
(PMG) Czech Republic

Type des. Part no.


No. of p.
Prep. /Annelie Kruse Doc. kind List
Appr. /Kruse Annelie E Approved Title Index Material certificate 1
Resp. dept MMO
Doc. no. Lang. Rev. ind. Page

ABB AB L001071D0068 en 1
DOCUMENT No 16 DOCUMENT No 16

RAPPORT DETAILLE DES CONTROLES NON DETAILED REPORTS OF THE NON DESTRUCTIVE
DESTRUCTIFS EFFECTUES SUR LES SOUDURES EXAMINATION CARRIED OUT ON EQUIPMENT
OU SURFACE DES APPAREILS OU/ET LEURS WELDS OR SURFACES AND/OR THEIR PARTS AND
ELEMENTS ET LES RAPPORTS DES CONTROLES REPORTS OF THE DESTRUCTIVE TESTING
DESTRUCTIFS EFFECTUES LORS DE LA PERFORMED DURING THE FABRICATION.
FABRICATION.

Not Applicable
DOCUMENT No 17 DOCUMENT No 17

DIAGRAME DES TRAITEMENTS THERMIQUES (S’IL THERMAL TREATMENT CHARTS


Y A LIEU) (IF APPLICABLE)

Not Applicable
DOCUMENT No 18 DOCUMENT No 18

CONDITIONS DES EPREUVES HYDROSTATIQUES HYDROTESTING CONDITIONS

Not Applicable
DOCUMENT No 19 DOCUMENT No 19

CERTIFICATS D’INSPECTION DES VISITES INTERNAL AND EXTERNAL INSPECTION


INTERNES ET EXTERNES CERTIFICATES
5-420 Erb. St. West, Suite 203
WAG Q.A. SERVICES CANADA INC. Waterloo, ON N2L 6K6
Phone: (519) 745-7137
Quality Assurance *Management *Programs * Inspection * Source Surveillance * Auditing
Fax: (519) 745-0826

SOURCE SURVEILLANCE REPORT

Client Client or Supplier PO No. Date of Visit Date of Report Report No.

Rolls Royce – Mt Vernon IM 0002 18-20-May-09 21-May-09 1-Interim


Client Representative Inspector Inspector Signature WQA Job No.

Mr. Daniel Yost Klaus Severin On File 230-10-MA214


Supplier Supplier Location Supplier Contact(s) Standard (Identify)

ABB AB Machines Västeräs- Sweden Mr. Lars Sjöberg IEC 60034-1

Item(s) Purpose / Scope


Synchronous Generator AMS 1250 LC with
Witness tests on Generator , Main Terminal Box, Neutral
Main Terminal Box, Neutral Earthing Resistor Box,
Earthing Resistor Box, GCP, Spare parts
GCP, Spare parts. For RR Project M.A214

Delivery
Status Generator has been released for further processing – NOT including Packaging.

Details of Visit See Attached For Further Details

SUMMARY.

The inspector visited the premises of the manufacturer ABB AB Machines in Västeräs Sweden on 18-20.05.09
to carry out the Witness Inspection and Review Documentation on one Generator AMS 1250 LC and Accessories

Inspection and Documentation review was undertaken for Generator AMS 1250 LC and Accessories as per
Assignment Instruction required by Client Rolls Royce Energy Systems.

Results:
1. Review Documentation Satisfactory
2. Visual Inspection was performed and found acceptable to permit testing – See Comments.
3. Electrical tests performed on Generator AMS 1250 LC and Accessories were satisfactory,

Comments:
1. Minutes of Meeting (MOM) has been issued (Attached)
2. Punch list (Attached) was prepared by myself and Hemant Kashikar (the Client representative) for several
deficiencies and issued to ABB - action items will be verified during final inspection activities.

Remark:
1. Documents showed no stamp of approval of Rolls-Royce

Attendees:

Finn Fuglestein StatoilHydro Principal Engineer Electrical Technology


Hemant Kashikar Petrofac Electrical Engineer
Per Rudelius Bureau Veritas Inspector on behalf of Petrofac
Lars Sjöberg ABB AB Project Manager
Adnan Sarajlic ABB AB Senior Engineer, Control& Application
Klaus Severin WAG QA/ RR WAG QA Inspector on behalf of RR

Source Surveillance Report EL Page 1 of 7 QAR 005 R7


Sep 22, 2005
5-420 Erb. St. West, Suite 203
WAG Q.A. SERVICES CANADA INC. Waterloo, ON N2L 6K6
Phone: (519) 745-7137
Quality Assurance *Management *Programs * Inspection * Source Surveillance * Auditing
Fax: (519) 745-0826

SOURCE SURVEILLANCE REPORT

2. Documentation used

RR- Inspection & Test Plan Doc. No. IM0002-Q02-0001 Rev.2


ABB-Inspection & Test Plan Generator Doc. No. XYK 210 044-FMD, rev A
ABB-Technical Specification Generator Doc. No. XYK 210 045-FMD, rev C
ABB-Outline Drawing Generator Doc. No. XYK 210 004-FMD, rev E
ABB-Circuit Diagram Generator Doc. No. XYK 210 100-FMD, rev D
ABB-Outline Drawing MTB Doc. No. XYK 210 780-FMD, rev F ( Main Terminal Box)
ABB-Inspection & Test Plan GCP Doc. No. 3BSY 200 420-FMD, ( Generator Control Panel)
ABB-Technical Specification GCP Doc. No. 3BSY 200 439-FMD, rev B
ABB-Outline Drawing GCP Doc. No. 3BSY 200 401-FMD, rev D
ABB-Circuit Diagram GCP Doc. No. 3BSY 200 400-FMD, rev C
Elec.Gen. Test Procedure Doc. No. IM0002-P01-0004 Rev.2
Technical Specification AC Gen. GED00017934 Project M.A214.01 Petrofac Rev.A

Remark:

ABB confirmed that all Documents are approved by RR.


Comments of RR and Petrofac has been implemented in the Documents.

DETAILS

1. Inspection performed

Inspection has been performed on the following Equipment:


ABB Scope of supply

Item 001 1 ea. Synchronous Generator AMS 1250LC


Serial no. 8268 123
Design no. XYK 210 000-FMD
25375 kVA
10000 V
50 Hz
1465 A
69/12 V/A Exitation
IP 55

Item 002 1 ea. Main Terminal Box


Design no. XYK 210 098-FMD

Line side:
3xCT´s(3 cores), 3xVT´s(3 cores)
And 3 x Rogowski coils, one per phase
Earthing device 3 phase, ball-bolt

Neutral side:
3 x CT´s ( 3 cores) and 1x CT ( one Core)

Item 003 1 ea. Neutral Earthing Resistor Box


Design no. XYK 210 790-FMD
750 A, 10 sec.
IP 54

Source Surveillance Report EL Page 2 of 7 QAR 005 R7


Sep 22, 2005
5-420 Erb. St. West, Suite 203
WAG Q.A. SERVICES CANADA INC. Waterloo, ON N2L 6K6
Phone: (519) 745-7137
Quality Assurance *Management *Programs * Inspection * Source Surveillance * Auditing
Fax: (519) 745-0826

SOURCE SURVEILLANCE REPORT

Rated continuous current 60A


Double skin design

Item 004 1 ea. GCP( Generator Control Panel)


Serial no. P10449
Design no. XYK 214 001-FMD
BASLER DECS-200, REG 316*4
Ordinary and back up and Synchrotact 5.

Item 005 1 ea. Rotor removal tool


Design no. XYK 210 977-FMD

Item 006 1 ea. Pare Parts


Design no. XYK 210 500-FMD
- Commissioning spare parts
( 6 Diodes, 2 Thyristors and 1 CPU)
- AVR spare parts commissioning
( 1 Exitation contact and 1 Auxiliary relay)

Item 007 1 ea. Export seaworthy packing

Item 008 1 ea. Current Transformers as loose Items


- 3 x CT with 3 core

1.1 Synchronous Generator AMS 1250LC

Inspection steps acc. To ITP no. Doc. No. XYK 210 044-FMD, rev A

Item 1-29 Internal tests

Item 60- 106 official tests


60- 63 only test Certificates
64- 72 work shop tests review Certificates
73- 99 Witnessed tests
100- 106 Calculations, based on the witnessed tests

Item 73 Magnetic Neutral pos. axial play in bearing


Requirement : Spec. 4104 016E-43
Result: Satisfactory

Item 74 Shaft Voltage measurement


Requirement : Spec. 4104 016E-14
Result: Satisfactory

Item 75 Phase sequence and Terminal marking


Requirement : Spec. 4104 016E-10
Result: Satisfactory

Item 76 Overspeed test


Requirement : Spec. 4104 016E-12
Result: Satisfactory

Source Surveillance Report EL Page 3 of 7 QAR 005 R7


Sep 22, 2005
5-420 Erb. St. West, Suite 203
WAG Q.A. SERVICES CANADA INC. Waterloo, ON N2L 6K6
Phone: (519) 745-7137
Quality Assurance *Management *Programs * Inspection * Source Surveillance * Auditing
Fax: (519) 745-0826

SOURCE SURVEILLANCE REPORT

Item 77 Vibration Measurements


Requirement : Spec. 4107 011E-11
Result: Satisfactory

Item 78 Vibration Measurement during retardation or acceleration


Requirement : Spec. 4107 011E-15
Result: Satisfactory

Item 79 Control of Proximity Vibration Units


Requirement : Spec. 4107 011E-18
Result: Satisfactory

Item 80 Voltage and Current Balance


Requirement : Spec. 4104 016E-11
Result: Satisfactory

Item 81 No-load losses at P.F.=1


Requirement : Spec. 4104 016E-6
Result: Satisfactory

Item 82 No-load Characteristics and losses


Requirement : Spec. 4104 016E-6
Result: Satisfactory

Item 83 Short Circuit Characteristics and losses


Requirement : Spec. 4104 016E-7
Result: Satisfactory

Item 84 Load point at P.F.=0 ( Full load)


Requirement : Spec. 4104 016E-15
Result: Satisfactory

Item 85 Load curve at P.F.=0


And rated voltage
Requirement : Spec. 4104 016E-15
Result: Not performed acc. To spec. not
Necessary due to Full load test Item 84

Item 86 V-curve measurement at rated voltage


And no active output
Requirement : IEEE 115
Result: Satisfactory

Item 87 Heat run at P.F.=0


Requirement : Spec. 4104 016E-16
Result: Satisfactory

Item 88 Dielectric test after heat run at P.F.=0


Requirement : Spec. 4104 016E-13
Result: Satisfactory

Source Surveillance Report EL Page 4 of 7 QAR 005 R7


Sep 22, 2005
5-420 Erb. St. West, Suite 203
WAG Q.A. SERVICES CANADA INC. Waterloo, ON N2L 6K6
Phone: (519) 745-7137
Quality Assurance *Management *Programs * Inspection * Source Surveillance * Auditing
Fax: (519) 745-0826

SOURCE SURVEILLANCE REPORT

Item 89 Sound level measurement


Requirement : Spec. 4104 016E-26
Result: Satisfactory

Item 90 Sudden three-phase short-circuit test


At 30,50 and 70% of rated Voltage
Requirement : Spec. 4104 016E-21
Result: Satisfactory

Item 91 Negative –sequence reactance (X 2)


Requirement : Spec. 4104 016E-8
Result: Satisfactory

Item 92 Zero sequence reactance (X 0)


Requirement : Spec. 4104 016E-9
Result: Satisfactory

Item 93 Wave form analysis THD


Requirement : Spec. 3BSM 901325
Result: Satisfactory

Item 94 Functional test of jacking oil system


Requirement : Spec. ABB Standard
Result: Satisfactory
Only provision for oil pump
Oil pump not ordered

Item 95 PMG , output voltage and frequency


Requirement : Spec. acc. drawing
Result: Satisfactory

Item 96 Measurement of insulation Resistance


Before and after dielectric tests
Requirement : Spec. 4104 016E-3
Result: Satisfactory

Item 97 Dielectric tests


Requirement : Spec. 4104 016E-13
Result: Satisfactory

Item 98 Test of Main Terminal Box


Requirement : Spec. 4104 016E-25
Result: Satisfactory

Item 99 Final mechanical Inspection


Visual/Dimensional / Painting of Main Terminal Box
Requirement : Spec. 4104 016E-18
Result: Satisfactory

Source Surveillance Report EL Page 5 of 7 QAR 005 R7


Sep 22, 2005
5-420 Erb. St. West, Suite 203
WAG Q.A. SERVICES CANADA INC. Waterloo, ON N2L 6K6
Phone: (519) 745-7137
Quality Assurance *Management *Programs * Inspection * Source Surveillance * Auditing
Fax: (519) 745-0826

SOURCE SURVEILLANCE REPORT

Item 100 Determination of rated excitation current


Requirement : Spec. 4104 016E-20
Result: Satisfactory

Item 101 – 106 Determinations based to the actual reached Test results

1.2 GCP

Inspection steps acc. To ITP no. Doc. No. 3BSY 200 420-FMD

Item 1-11 Internal tests

Following checks has been witnessed

Item 31- 41 Witnessed tests


Check on Auto Voltage Regulator
Requirements: Spec. 4169 001-21

Item 51- 55 Witnessed tests


Check on Synchronizing
Requirements: Spec. 4169 001-5

Item 61- 71 Witnessed tests


Check on Relay Protection – F1
Requirements: Spec. 4169 001-7

Item 81- 89 Witnessed tests


Check on Relay Protection – F2
Requirements: Spec. 4169 001-7

Results: Satisfactory, please see test report as per attachment no.


For exceptions and notes, please see attached Punch list

3. Check of Documentation
Internal test Reports has been reviewed
Calibration Certificates has been reviewed
Documentation has to be completed.
Documentation has to be submitted to Rolls Royce for completion of MDR.
Complete MDR will be submitted from RR to Client

MOM and Punch list have been issued and signed by the participants.
Test records have been signed for acceptance.
Please see attachment.
Generator has been released for completion – but NOT released for packaging.

Source Surveillance Report EL Page 6 of 7 QAR 005 R7


Sep 22, 2005
5-420 Erb. St. West, Suite 203
WAG Q.A. SERVICES CANADA INC. Waterloo, ON N2L 6K6
Phone: (519) 745-7137
Quality Assurance *Management *Programs * Inspection * Source Surveillance * Auditing
Fax: (519) 745-0826

SOURCE SURVEILLANCE REPORT

3. Summary:

• Generator serial no. 8268 123 has to be completed acc. to MOM and Punchlist.
Final Inspection will be made internally by ABB and Documented.
• Ready for transport is foreseen in week 22
• Main terminal box has to be completed acc. To MOM and Punchlist.
Final Inspection will be made internally by ABB and Documented.
• Neutral Earthing Resistor Box has to be completed acc. To MOM and Punchlist.
Final Inspection will be made internally by ABB and Documented.
• GCP has to be completed acc. To MOM and Punchlist.
Final Inspection will be made internally by ABB and Documented.

The above will be verified during Final Inspection activities.

4. Attachments:

01 Minutes of Meeting, ( first draft)


02 Punchlist ( first draft)
03 Test Records generator
04 Test Records GCP
05 List of Participants

Pic. no. 5589-5620 FAT 18.05.09


5642-5654 FAT 19.05.09
5672-5678 FAT 20.05.09

Remark: MOM and Punchlist is the first draft, final issues will follows

END OF REPORT

Procedure Compliance Check (Also see attached for details if required)

N/A

Source Surveillance Report EL Page 7 of 7 QAR 005 R7


Sep 22, 2005
DOCUMENT No 20 DOCUMENT No 20

CERTIFICAT D’EPREUVE HYDROSTATIQUE HYDROSTATIC CERTIFICATES

Not Applicable
DOCUMENT No 21 DOCUMENT No 21

MODELE DE PLAQUE D’IDENTIFICATION PRO-FORMA NAME PLATE FOR PRESSURE


POUR APPAREIL SOUS PRESSION EQUIPMENT

Not Applicable
DOCUMENT No 22 DOCUMENT No 22

CERTIFICATS D’ESSAI TEST CERTIFICATES


DOCUMENT No 23

MODELE DE PLAQUE D’IDENTIFICATION POUR NAME PLATE PRO-FORMA FOR HEAT


ECHANGEUR DE CHALEUR EXCHANGER

Not Applicable