Vous êtes sur la page 1sur 3

February 07, 2024 06:09 PM

QA/QC INSPECTION REPORT


By: ProcessMAP Admin

Inspection
Type of report QA/QC Inspection Report
Type de rapport

Ramp Check list No


Liste de vérification de la rampe

RTIF Container Inspection Form No


Formulaire d'inspection des conteneurs
RTIF (Ramp Inspection and Transfer of
International Freight)

Basic Delivery Information (Informations de base sur la livraison)


Approval Number na
Numéro de (SR)

Sales Order #
Bon de réception

QA/QC Report ID QIR-2024-DAP-0207121529137


ID du rapport QA/QC

Generator Name
Nom de l'entreprise

Location Niagara
Emplacement

Facility Niagara
Installation

Type of Inspection EfW- MSW inspection / Inspection des déchets EfW- MSW
Type d'inspection

Bay Assignment
Affectation de baie

Broker
Courtier

Hauler modern
Transporteur

Trailer Number
Numéro de remorque

Ship from Location


Lieu de service / fournisseur

Facility QA/QC Michael Thomas


Contrôle qualité (QA/QC) de
l'installation

Manifest Number 2671


Numéro de manifeste

Add Picture of Manifest


Ajouter une image du manifeste

Is this a New Approval - 1st


inspection?
S'agit-il d'une nouvelle approbation -
première inspection ?

Date of Delivery February 07, 2024


Date de livraison

Time of Delivery 07:14 AM


Heure de livraison

Waste Type MSW / Déchets Solides Municipaux


Type de déchets

Waste Description good morning


Description des déchets

Tons
Tonnes

Gallons
Gallons

Pounds
Livres

Page 1 of 3
February 07, 2024 06:09 PM
QA/QC INSPECTION REPORT
By: ProcessMAP Admin

Generator Address
Adresse de l'entreprise

Outcome of Delivered Load (Résultat de la livraison de la charge)


Acceptance Status Accept / Accepter
Statut d'acceptation

Sub Status
Sous-statut

Facility is Requesting a Hold No


Evaluation
for this Approval
En attente d'une analyse de déchets
avant approbation

Scheduling Issues (Not a discrepancy - Billing purposes only) - Problèmes de planification (Uniquement à des fins de
facturation)
Is there a Scheduling issue with this No
load
Y a-t-il un problème de planification
avec cette charge ?

Was this a standing slot or


scheduled
load?
S'agissait-il d'un emplacement permanent
ou d'une charge planifiée ?

Select Scheduling Issue Reason


Code
Sélectionnez le code de raison du
problème de planification.

MSW Checks
Truck Number
Picture of Truck License Plate
Date of Delivery February 07, 2024

Time of Delivery 07:14 AM

Description of the Load


Pictures of the Load
MSW Action Items

Is there a Discrepancy? (Y a-t-il une divergence?)


No Discrepancy No
Aucune divergence

Discrepancy No
Divergence

MPF Specific Checks(v1)


Is there a Discrepancy?(v1) No

Was there an odor strong enough to No


warrant a discrepancy?(v1)
Was there a reaction or a spill No
warranting a discrepancy?(v1)
Treatment Technology Change No
Requested(v1)

Covanta Treatment Technology Change Sheet(v1)


Has New Profile been approved by No
CES?(v1)
Change Approved(v1) No
Operational Manager

Change Approved(v1) No
Customer Service

Page 2 of 3
February 07, 2024 06:09 PM
QA/QC INSPECTION REPORT
By: ProcessMAP Admin

Did Customer agree to the change? No


(v1)

QA/QC Notes Section (This section is strictly for QA/QC Facility Notes) - Section Service Client
Comments from Facility QA/QC
Commentaires de l'installation QA/QC

Add pictures of issues


Ajouter des photos des problèmes

Status Open
Statut

Date Stamp when Closed February 07, 2024


Date lorsque fermé

Agent Responsible (Agent


responsable)
(Person currently handling the issue-
Also for assigning Scheduling Issues to
Customer Care) - (Personne actuellement
chargée du problème - également pour
attribuer les problèmes de planification
au service client)

Off-Spec and Analytical Fees (Frais hors spécifications et frais analytiques)


Was there a labor fee to the
customer?
(Y a-t-il eu des frais de main-
d'œuvre
pour le client ?)
This section is not for scheduling fees.
This section is only for labor fees and
fees specific to the facility floor.
(Cette section n'est pas destinée aux
frais de planification. Elle concerne
uniquement les frais de main-d'œuvre et
les frais spécifiques au sol de
l'installation)

Reason for Labor fee


Raison des frais de main-d'œuvre

Does an added fee apply to this No


load?
S'applique-t-il des frais
supplémentaires à cette charge?

Corrective Action Report (This Section is strictly for Material Compliance and Customer Care) - Rapport d'action
corrective (Cette section est strictement réservée à la conformité des matériaux et au service client)
Is Action Required? No
Une action est-elle nécessaire ?

Actions Taken (Les mesures prises)


by Customer Care and/or Material
Compliance (par le service client et/ou
la conformité des matériaux)

Customer Response
Réponse du client

Corrective Action Report (CAR) and


Customer Response
Rapport d'action corrective (CAR) et
réponse du client

Approval Issues Section


Approval is on HOLD until issue is
resolved
Is a New Approval needed?
Does the Approval need revised?
Does the Approval need recertified?

Page 3 of 3