SUPPORT DE FORMATION
Cours EXP-PR-PR040
Rvision 0.1
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
LE PROCESS
LE PUITS ACTIV PAR POMPAGE CENTRIFUGE IMMERGEE
SOMMAIRE
1. OBJECTIFS .....................................................................................................................6
2. LES FONCTIONS DES PUITS ACTIVES PAR PCI ........................................................7
2.1. INTRODUCTION.......................................................................................................7
2.2. LEFFLUENT ...........................................................................................................10
2.2.1. Description compositionnelle ............................................................................10
2.2.2. Enveloppe de phase .........................................................................................11
2.2.3. lments indsirables.......................................................................................12
2.2.4. Caractristiques d'une huile..............................................................................12
2.2.5. Diffrents types d'huile......................................................................................13
2.3. EXERCICES ...........................................................................................................14
3. FONCTIONNEMENT DES PUITS PCI ..........................................................................15
3.1. HAUTEUR DE REFOULEMENT .............................................................................18
3.2. quipement de fond ................................................................................................19
3.2.1. Le diffuseur et limpulseur .................................................................................20
3.2.2. Le moteur .........................................................................................................21
3.2.3. Aspiration et premiers lments de pompage ..................................................22
3.3. quipements alimentation lectrique en surface.....................................................23
3.3.1. Circuit puissance ..............................................................................................23
3.3.2. Cbles de puissance ........................................................................................24
3.3.3. Armoire de contrle (switch board) ...................................................................27
3.3.4. Variateur de vitesse ..........................................................................................28
3.4. System efficiency ....................................................................................................29
3.5. EXERCICES ...........................................................................................................31
4. LES DIFFERENTS TYPES DACTIVATION PAR POMPAGE.......................................33
4.1. AVANTAGES ET INCONVENIENTS DES DIFFERENTS TYPES ..........................34
4.1.1. Choix dune mthode dactivation .....................................................................34
4.1.2. Le pompage centrifuge immerg ......................................................................37
4.1.3. Le pompage cavit progressive .....................................................................38
4.1.4. Le pompage aux tiges ......................................................................................39
4.2. EXERCICES ...........................................................................................................40
5. REPRESENTATION ET DONNEES DES PUITS ..........................................................41
5.1. REPRESENTATION SUR PFD (PROCESS FLOW DIAGRAM) .............................41
5.2. REPRESENTATION SUR P&ID..............................................................................43
5.3. SYSTEME NUMERIQUE DE CONTROLE ET DE COMMANDE............................45
5.4. EXERCICES ...........................................................................................................49
6. LE PUITS ET LE PROCESS .........................................................................................50
6.1. LOCALISATION ET CRITICITE ..............................................................................50
7. PARAMETRES DE FONCTIONNEMENT .....................................................................52
7.1. MARCHE NORMALE ..............................................................................................52
7.1.1. Puits producteurs..............................................................................................52
Support de Formation: EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 2 de 195
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
1. OBJECTIFS
Le but de ce cours est de permettre une meilleure comprhension du puits, lment
primordial du systme de production, et principalement du process des puits activs par
pompe centrifuge immerge, afin de rpondre mieux aux contraintes imposes par la
production et ce dans des conditions optimales.
2.1. INTRODUCTION
Un puits peut tre activ pour produire plus mais surtout lorsque l'effluent n'a plus
suffisamment d'nergie pour accder la surface dans les conditions fixes par le
procd.
Refoulement
Ppompe
P formation
Z
Figure 1: Reprsentation puits activ par PCI
Si cette hauteur est infrieure la profondeur du puits L, celui-ci ne sera pas ruptif.
perte de charge par friction dans le tubing PC qui est fonction du dbit Q
pression en tte de puits Pt qui est impose par les installations de surface donc :
Si la pression de gisement ne permet pas l'ruptivit du puits ou si le dbit Q est jug trop
faible, il y a lieu de faire appel un moyen d'activation.
RCV
Qhh
SSV
Pch
Qg
RESEAU
U / Back Spin
ASV
Pf
F Hz
Liquide + Gaz
Mais aussi, il est important de comprendre les besoins des autres services (tels que le
Gisement) qui ont besoin des donnes rcupres par les producteurs pour optimiser la
rcupration des hydrocarbures en place et donc pour maintenir la production du champ.
2.2. LEFFLUENT
Que ce soit de lhuile, du gaz, de leau ou un mlange des trois, leffluent se dcompose
en lments carbons simples (thane, mthane, etc..) ainsi quen lments spcifiques
(N2, CO2, H2S, etc..).
Toutes ces variables sont dtermines en laboratoire et servent de base dans tous les
calculs effectus par la suite (process, pertes de charges etc ...). Notamment pour le
dimensionnement des quipements du puits
Lhydrocarbure est dcrit par des proprits caractristiques (masse volumique huile/gaz,
viscosit) de mme que par une enveloppe de phase rsultant d'une analyse de ses
constituants (C1, C2, etc., jusqu' un mlange lourd dcrit par ses proprits et nomm
C11+).
Cette description complte est utilise surtout pour les gaz et les fluides lgers. On notera
que chaque lment possde ses caractristiques propres (pression critique, temprature
critique, masse molaire, etc.)
Cette enveloppe de phase spcifie ltat (liquide/gaz) dans lequel est lhydrocarbure en
fonction de la pression et de la temprature du milieu o il se trouve (rservoir, fond du
puits, surface).
Courbe de bulle est la partie de la courbe enveloppe de phase pour laquelle T<TC.
Elle reprsente les conditions dans lesquelles la premire bulle de gaz apparat
dans la phase liquide.
Support de Formation: EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 11 de 195
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Courbe de rose est la partie de la courbe enveloppe de phase pour laquelle T >
TC. Elle reprsente les conditions dans lesquelles la premire goutte dhuile
apparat dans la phase gaz.
L'origine de la description prcise du fluide effluent est l'analyse PVT (Pression Volume
Temprature) fournie par le laboratoire d'aprs un chantillon pris au fond du puits.
Les lments indsirables lis leffluent proprement dit tel que leau, lH2S, le
CO2, le sable, le mercure dans le gaz doivent tre pris en compte dans le
dimensionnement des puits et des installations de surface
Densit ( 15 C, 1 atmosphre)
GOR ( Gas Oil Ratio, s'exprime en m de gaz (15 C - 760 mm Hg) par m d'huile
stockage produits ensemble.)
Pression de bulle
Viscosit
pH - Agressivit
En gas lift, seuls les GLR comptent, car l'eau associe la production d'huile est
galement lifter.
Dans les conditions de rservoir producteur (P & T), l'huile contient plus ou moins de gaz
dissous.
Bitume
API < 10
d = 1
GOR NEGLIGEABLE
Huile lourde
GOR = 10 20 m/m
Bo = 1,20
2.3. EXERCICES
TTH
PTH
SSV
Qgaz ventil
SCSSV
(& SAV)
Refroidissement
du moteur par le
fluide pomp
P refoulement
P
P aspiration PTB (ou
M BHFP) PG
Cote perfos
L'nergie lectrique est achemine au moteur depuis la surface par un cble triphas
droul et fix au tubing au fur et mesure de la descente.
Pour chaque tage, la pompe fournit au fluide pomper une nergie sous forme de
vitesse par l'intermdiaire de l'impulseur qui tourne environ 2900 Tr/mn pour une
alimentation lectrique en 50 Hz. Cette nergie cintique est transforme en nergie
potentielle dans le diffuseur. La hauteur de refoulement fournie par un tage dpend du
Support de Formation: EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 15 de 195
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Les pompes centrifuges sont en principe destines aborder des fluides monophasiques.
Il n'empche qu'elles sont souvent utilises dans des conditions o du gaz libre est
prsent leurs ouies d'aspiration.
Pour limiter le gaz libre passant dans la pompe, l'industrie met l'heure actuelle la
disposition des producteurs des sparateurs de gaz, essentiellement de 2 types :
De plus, une partie du gaz libre se prsentant la hauteur de l'unit de pompage n'entre
pas dans le sparateur mais est directement vacu par l'annulaire casing x tubing. (voir
schma suivant).
Il permet d'atteindre une P. de fond infrieure celle que l'on peut obtenir en gas lift (avec
GRL raisonnable).
gaz
PTH
PCH
Duse
SAV Huile + Eau
SCSSV (+ gaz)
Zone d interface
et niveau liquide
Moteur
et P. refoul. Sous
gaz refroidisst les
huile Pompe perfos
centrifuge
eau IP immerge
Pg P. aspir.
Figure 6: Schmatisation du fonctionnement classique dun puits PCI (Cot TBG + Cot
CSG)
Transformateurs
(1 par phase)
Ampremtre
Armoire de contrle
Tte de puits
Bote de jonction
Bleeder valve
Casing
Moteur
Centreur
1/2 m v = m H
En d'autres termes, la hauteur H exprime en mtres sera la mme que le fluide pomp
soit de l'eau (D =1), du brut (D = 0,80) ou de la saumure.
Si la pression de gisement ne permet pas l'ruptivit du puits ou si le dbit est jug trop
faible, il y a lieu de faire appel un moyen d'activation.
Plus gnralement, il peut tre ncessaire dactiver uniquement pour redmarrer un puits
si l IP est lev, ou en cas de cross flow, coning gaz
Pompe
Sparateur de gaz
Protecteur
Moteur
Impeller
Diffuser
Impulseur en Coussinet de
rotation diffuseur
(Diffuser PAD)
Alesage de centrage
de la roue (Skirt Bore)
Moyeu de la roue
(HUB )
Bague d'quilibrage
Epaulement (Balance Ring)
suprieur
Coussinet de
roue
(Impeller PAD)
Epaulement Jupe de la
infrieur roue
(SKIRT)
Diffuseur fixe
(Diffuser Bore)
3.2.2. Le moteur
Ce sont des moteurs triphass, cage d'cureuil, deux ples, qui tournent 3 475 t/mn
avec un courant de 60 Hz de frquence et 2 880 t/mn avec un courant de 50 Hz. Le
schma ci-aprs reprsente le moteur REDA.
Il est possible de monter plusieurs moteurs en tandem. Ces moteurs sont remplis d'huile
minrale. Selon le type de moteur et leur design, leur tension d'alimentation peut aller de
250 5 000 volts et l'intensit peut aller jusque vers 100 ampres.
Coupling
Bride de raccordement
sur un 2me housing
Sortie effluent
Aubage
Diffuseur
Aspiration
(sans sparateur)
Bride
de raccordement
Housing = ensemble dtages pr-assembls avec raccor
Exemple
Distribution 380 ou 410V 3 X ( 0 410V 574 V)
(5,5 ou 20 kV) soit 0 1230 1522 V
Moteur
lectrique
Conductors
Insulation
Jacket
Power cble
Cble armor
Tubing string
Clamps
Pumping unit
Flat cble
Cbles lectriques
Gaine isolante
Enrobage lastomre
Feuillard galvanis
Conducteur cuivre
transmission mesure de fond
7 conducteurs cuivre toronns
Bande isolante
BIW Rond
BIW T03
Feuillard galvanis
Bande isolante
7 conducteurs cuivre toronns
Gaine tflon
Bande tflon
Gaine tissu
Conducteur cuivre
Gaine plomb
Elastomre
Feuillard mtallique
Pigtail
connector
Penetrator
Downnole
connector
Dang
er Downhole
High cable
voltage
High voltage
compartment
Ses fonctions
Marche / Arrt
Enregistreur de l'intensit
Relais de surintensit
Relais de sousintensit
Surintensit = I nominale + 5 7 %
Sousintensit = I nominale - 10 20 %
120 x F
N=
p
Le dmarrage progressif vite une surintensit, alors qu'un dmarrage en prise directe
engendre une surintensit 3 5 fois l'intensit nominale.
39.0 kw
100 kw 4 kw 0.8 kw lifts fluid
input
1 kw
cnoke
VSC Transformateur
(96% eff.) (99% eff.)
2.1 kw
Tubing friction
34.5 kw
Pump
55% efficient
13.8 kw
Motor
85% eff.
80.0 hz 89.5 hz
Pump
6.000 minimum
range
Pump
performance
4.000 curve
Head 60.0 hz
VSC : 500 kva
FT. Puma : 54 stage
Motor : 60 hz rating
3.000 544 senes
53.1 hz
225 ho
2100 voit
63 amo
2.000
Pump xxxx
40.0 hz xxxx xxxx
Pump best
efficiency
1.000
1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Production b/d
3.5. EXERCICES
Cet apport d'nergie permet au fluide de "poursuivre" son chemin et soulage la couche de
tout ou partie des contre pressions en aval de la pompe.
Plusieurs techniques de pompage sont mises en uvre pour pouvoir rpondre aux
nombreux problmes poss tels que : productivit du puits, nature du fluide, compltion,
implantation et environnement terrestre ou offshore, ainsi que critres conomiques
respecter,...
le pompage aux tiges : une pompe volumtrique de fond est actionne depuis la
surface par l'intermdiaire de tiges et d'un systme de va-et-vient.
Nous dresserons la liste exhaustive des avantages et inconvnients que lon rencontre
lorsque lon choisit le gaslift ou le pompage centrifuge immerg comme mthode
dactivation pour des puits producteurs non-ruptifs.
productivit du puits
profondeur.
500-2300 m/j
32-500 m/j
< 32 m/j
Profondeur du Puits
< 3600 m
< 2400 m
Cette prslection sera confirmer en fonction des problmes rencontrs sur le puits et
des diffrents facteurs suivants :
profil du puits
degr dautomatisation
Mthode dACTIVATION
Bon
GOR lev Excellent (si rotary gas Mdiocre Passable
separator)
Bon
Souplesse pour les dbits Bon (si variateur de Moyen Bon
frquence)
Moyen
Prsence de gaz libre Excellent (si rotary gas Mauvais Mauvais
separator)
Possible Oui
Possible
Effluent visqueux (peu utilise)
(si viscosit < (le plus Oui
200 cp) utilis)
Avantages :
Dbits importants
Simplicit de conception
Peu encombrant
Pas de nuisances
Facile oprer
Peut tre installe dans un puits dvi condition dtre dans une partie rectiligne
Inconvnients :
pas utilisable pour les faibles dbits (30 m3/J mini pour refroidissement moteur)
cration dmulsions
Avantages :
simplicit dinstallation
Inconvnients :
Avantages :
simplicit de conception
automatisation facile
Inconvnients :
profondeur limite
solides gnants
dbits faibles
4.2. EXERCICES
Plan de circulation des Fluides (PCF/PFD) : ce document dit lors de la phase projet,
prsente sous format simplifi, les principales lignes et capacits process ainsi que leurs
paramtres de fonctionnement principaux.
Figure 23: Vue gnrale SNCC regroupant les diffrents puits PCI
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 46 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
5.4. EXERCICES
6. LE PUITS ET LE PROCESS
Toutes les fonctions sont essentielles pour la production si lon considre quelles sont
ncessaires pour raliser les spcifications requises du produit en sortie.
En revanche la quantit de puits sur une mme plateforme tempre le degr de criticit de
lensemble (sauf pour certains puits ddis une fonction spcifique ex : puits gaz
alimentant une turbine -).
Production
Fonction quipements Criticit Secours By-pass
tat*
MOUSSES
GOUTTELETTES DE GAZ
LIQUIDE DANS GAZ TRAITEMENT GAZ
EFFLUENTS TETES DE PUITS
DESHYDRATATIONCONDENSAT
RECUPERATION EAU
CONDENSAT
SEPARATION
GAZ-LIQUIDE
GAZ
EMULSION
EAU/HUILE MELANGEES
export
brut
SEPARATION TRAITEMENT
HUILE-EAU EMULSION
EMULSION
7. PARAMETRES DE FONCTIONNEMENT
Dans ce chapitre, nous verrons lensemble des paramtres suivre quotidiennement par
un oprateur afin dassurer un bon fonctionnement du puits.
Beaucoup de ces paramtres relevs sont historiss et loprateur doit avoir accs ces
historiques, de manire pouvoir porter un jugement critique sur le comportement du
puits.
GAZ
P T
Sparateur
Production
HUILE
EAU
Sparateur
TEST
Puits Manifold
PRODUCTION
PRODUCTEURS
+ TEST Sparation
PRODUCTION + TEST
En normal operating, cest dire lorsque le puits produit de manire stable et contrle,
leffluent transite du puits vers le MANIFOLD via la flowline.
MANIFOLD : il a pour fonction de collecter les arrives deffluent de tous les puits et de
pouvoir les diriger soit vers le sparateur PRODUCTION soit vers le sparateur TEST par
le biais dun jeu de vannes.
Sparateur TEST : Il faut savoir que ce sparateur nest ddi qu un seul puisquil sert
le tester donc compter les phases de leffluent (phase huile, phase gaz et phase eau)
de celui-ci. Il est positionn en parallle du sparateur PRODUCTION.
PC
FT
14"
Torche
Torche
10"
SBDV FT
14"
SDV KY511
14" SDV
Manifold
70 m
7 - 29 bar
LDC
40 - 60 C LC
Figure 28: Schma sparateur TEST conventionnel avec quipements de comptage des
phases
Lorsque les puits sont mis en production, ils sont ouverts en fonction des Consignes
dexploitation PUITS . Ces consignes fixent les valeurs cible adopter pour
loperating des puits.
Elles sont dictes par le Dpt Productivit Puits et garantissent un niveau dexploitation du
gisement optimal. Il convient de les respecter scrupuleusement.
Voir en exemple le tableau page suivante : Consignes de rglage des puits PCI TOTAL
CONGO
102S ESP 35 10 35 8 16 1 68 14 16 44 REV Pwf mini = 16 b. Prendre la duse en manu aprs dmarrage, 18 35 111 2,55
108C ESP 45 10 55 5 53 42 14 65 15 58 70 FWD 55 Hz consigne, mesure 52Hz, variateur 54.8Hz 10 51 241 3,45
110T ESP 40 5 48 5 65 14 18 35 FWD Retour vitesse 49 Hz, pour consigne 48 Hz. 10 40 101 2,88
Trip si Pwf < 20 bar ou Tm > 90 C ou Pd > 90 bar. Duse annulaire 5 b en auto.
115G ESP 35 5 37 5 1 90 12 14 38 FWD Dmarrage aprs stabilisation P dgazage annulaire . Prendre la duse en tte de puits en manu aprs 10 50 145 3,7
dmarrage,
117ST ESP 40 10 46 5 28 3 90 12 21 35 FWD Pwf mini = 27 b. Trip si Pwf < 25 b ou Tm > 90 C ou Pd > 90 bar. 27 47 106 3,29
JAUGE HS : surveiller le dbit gaz annulaire. Si Qgaz annulaire en baisse (< 2 kSm3/j) => alors augmenter
118T ESP 47 3 47 3 33 10 2 65 14 18 48 FWD 10 40 133 2,76
temporairement la frquence + 1 Hz. Isolement 0.3 Gohm le 12/06/05.
123T ESP 40 10 49 3 10 5 75 10 16 31 REV Arrter la pompe si Tfond = 75C. Lecture Twf Pc Go. Capteur Pression : HS. 32 99 3,158
124T ESP 45 3 58 3 47 15 15 65 22 43 54 FWD Si arrt PCI par ''Emergency stop'' rebouter le variateur et purger le transformateur, Remise en service, 52 128 2,38
126C ESP 45 8 56 5 54 45 0,5 65 22 52 67 FWD Puissance maxi du variateur = 58Hz. 80 241 3,61
131T ESP 45 5 60 5 20 3 65 17 29 39 FWD Pwf mini = 10 b. Trip si Twf > 90C ou Pd > 90 bar. 10 57 129 3,289
133S ESP 35 8 39 6 34 10 0 65 20 25 53 REV Pwf mini = 9.5 b. Trip Phoenix si Pi < 8 b ou Tm > 90 C ou Pd > 90 bar. Prendre la duse en manu aprs 10 70 187 3,555
le dmarrage,
Ltzm Compltion du puits quipe d'une PCI. Duse en manu pour maintien GOR 200 Sm3/m3
ESP ESP Consigne RCV en manuel : 29.8 % SSD ouverte au dessus pompe : production en ruptif. 82 189 2,63
101 max.
Figure 29: Consignes de rglage des puits de GIR et JSM Aot 2006 (2)
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 55 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
TCDM 101 S Nettoyer liner d'injection 04/10/2006 23/09/2006 2 Confirmation liner bouch
TCDM 102 S Nettoyer liner d'injection 04/10/2006 29/09/2006 2 Confirmation liner bouch
TCDM 105 T 01/08/2006
TCDM 108 C Test de puits 11/02/2006
F de 46 48 Hz pour augmentation de
TCDM 110 T Qhh. 2 Mesures sable et Bsw / jour. 04/10/2006 14/09/2006 1 Augmentation Ok, AT test.
Attention compltion sans crpines.
TCDM 111 T 02/10/2006
F de 47 48 Hz pour augmentation de
TCDM 116 T 04/10/2006 29/08/2006 1 Augmentation Ok, AT test.
Qhh. 2 Mesures sable et Bsw / jour.
Lorsque les puits sont en production, il faut les monitorer : c'est--dire quil faut relever
leurs paramtres de fonctionnement (mesures), suivre leur volution et analyser celle-ci
afin de comprendre comment se ils se comportent.
7.1.2.1. Dfinitions
Les mesures sur un puits peuvent tre de deux sortes et le choix de l'une ou de l'autre
dpendra alors de l'utilisation voulue du paramtre pris en compte.
Les simples mesures qui sont en fait des indications et permettent la dtection d'une
anomalie.
Les enregistrements qui dterminent une tendance ou une volution afin de permettre une
analyse. Dans ce cas, on notera les enregistrements occasionnels utiliss lors de la
recherche de solution suite une anomalie.
7.1.2.2. Localisation
Remarque : Un trend est ncessaire pour observer les rsultats des actions
Remarque : Trends simultans : Les puits activs ou sur champs matures sont
complexes: transitoires, influence chemin, interfrence:
connatre les dbits produits sur sparateur de test ou autre mode de comptage
pour calculer la production par puits et le bilan matire
Figure 31: Vue Gnrale SNCC pour suivi paramtres de fonctionnement Puits PCI
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 60 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Figure 32: Vue Gnrale SNCC pour suivi parameters de fonctionnement Puits PCI
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 61 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Figure 33: Vue spcifique SNCC (courbesde tendance) pour suivi parameters de fonctionnement Puits PCI
7.1.2.5. Procdures
Il faut diffrencier les mesures de tous les jours des mesures occasionnelles.
Les objectifs sont donc bien diffrents, mais on se souviendra que dans les deux cas les
mesures sont importantes, mme si parfois cela semble la mme chose que la veille.
Enfin, on notera que pour les mesures de fond (qui permettent de quantifier les pertes de
charge dans la formation), il est impratif qu'elles soient effectues en simultan avec un
passage sur le sparateur de test. Le cas chant, elles ne servent rien alors que leur
cot est important.
Le relev de toutes ces mesures ne trouve pas son utilit dans le fait de stocker des
donnes. Bien au contraire, et c'est en regardant les diffrentes utilisations que l'on prend
conscience de l'importance de celles-ci. Il conviendra donc d'tre rigoureux dans ces
relevs de mesures.
On trouve des enregistreurs locaux soit de type cellule Barton (enregistreur plume utilis
pour la pression, la temprature et les dbits) soit de type autonome avec batterie (agr
pour utilisation en zone classe).
Ils permettent d'enregistrer gnralement des valeurs pour des dures 24 heures. Il est
impratif d'enregistrer les mesures en tte de puits pendant les tests, particulirement
pour les puits activs. Une simple lecture ne suffit pas.
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 63 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Nous venons de voir que les mesures releves sur un puits ont une importance norme
pour son suivi.
Il convient deffectuer une ronde journalire sur chaque puits afin de relever ces mesures,
de les noter et de les enregistrer. Pour ce faire, il existe des feuilles de relevs puits
disponible sur chaque site et archives en salle de contrle.
Loprateur en charge des relevs devra lorsquil les enregistre, comparer les valeurs avec
celles des journes prcdentes en vrifiant si des manuvres ont eu lieu sur le puits et
reporter sa hirarchie la moindre anomalie ou doute concernant ces mesures.
Lidentification de dfaillance nest pas aise, elle rsulte dune analyse / tests
rigoureux
- prcision diffrente
TROUBLESHOOTING
SUIVI JOURNALIERS TESTS
Premier niveau
Oprer en scurit
en maintenant lquipement de scurit et autres quipements
en appliquant des procdures appropries et progressives
Mesures :
Le dgorgement initial est la premire mise en production du puits. Cest une intervention
importante, car de sa russite va dpendre la qualit de la liaison couche / trou et donc
ltat final dans lequel va produire le puits. Il est important de passer du temps sur cette
opration en surveillant et respectant les paramtres.
Pour les dgorgements successifs (aprs un long arrt), il faudra contrler le dgorgement
pour la scurit des installations en aval et pour la prservation de la liaison couche / trou.
Puits activ :
Le contrle du puits passe par le dosage de lactivation. La duse apporte une scurit
supplmentaire.
Nous aborderons dans ce chapitre les fonctions de scurit qui permettent doprer un
puits :
Afin de garantir lintgrit physique et oprationnelle du puits, des scurits sont mises en
uvre afin de permettre une fermeture du puits automatique en cas de problme interne
ou externe au puits.
Une Spcification gnrale Groupe (GS EP SAF 226 Completed Wells Safety systems
and Safety rules dfinit clairement les protections ainsi que leur philosophie de
fonctionnement mettre en uvre.
Ces scurits sont gres par le systme numrique de contrle commande via le
logigramme de scurit ou agissent directement et localement sur le puits.
Chaque fois quune fermeture automatique de puits sur dfaut sera enclenche, il faudra
sassurer que toutes les actions du logigramme scurit sont valides et les historiser sur
un document appropri en salle de contrle. Prvenir la hirarchie de la moindre anomalie
ou incomprhension sur la mise en scurit du puits.
Regardons ci-aprs le dtail des scurits installes pour chaque type de puits ainsi que
les actions automatiques engendres.
Sur le Typical Shutdown Causes Matrix on retrouve le niveau darrt dun puits
(laction) en fonction du type de dfaut gnr.
Figure 38: Vue SNCC dun puits PRODUCTEUR ACTIVE par PCI avec son logigramme scurit
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 71 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Sur le Typical Shutdown Actions Matrix on retrouve laction automatique effectue sur
le puits en fonction du niveau darrt activ
Les tests de fonctionnement et les tests dtanchit des vannes de scurit SCSSV +
wellhead + christmas tree + annulaires sont soumis une rglementation groupe (CR EP
FPP 135) afin de garantir un niveau doprabilt irrprochable. Chaque site dtient une
procdure OPERGUID dcrivant la manire deffectuer ces tests de fonctionnement et
dtanchit.
Le graissage de ces mmes vannes (hormis la SCSSV) souscrit lui un planning gr par
lexploitant et le dpartement maintenance.
Figure 41: Extrait de la Company Rule CR EP FPP 135 - "Barriers on Completed Wells"
XXXX Le test d'tanchit a plus de 12 mois. XXXXXX Le test d'tanchit a plus de 10 mois.
Statut Eruptif Type SCSSV VM VM Vanne Vanne Vannes EA 1 Vanne EA2 Conformit Vanne(s) non
Puits YAF0 Observations
O/F E / NE Activation Tubing Annulaire N1 N2 (SSV) latrale sas manu 1 opre manu 2 manu Puits conforme(s)
YAM 001 O NE GL OK OK OK OK OK FU OK OK OK OK 1
Pas de volant sur la vanne SAS.
Date test 14/12/03 P 18/5/04 18/5/04 16/12/05 16/12/05 16/12/05 18/5/04 16/12/05 16/12/05 16/12/05 16/12/05
YAM 002 O NE GL LOT OK OK OK OK OK BO OK OK 1
STV et SAV nant; VM1 dure manuvrer
Date test 18/12/03 P 18/12/05 18/12/05 18/12/05 18/12/05 18/5/04 18/5/04 18/5/04 18/5/04
YAM 003 O NE GL OK OK OK OK OK OK OK OK SANS 0 SSV Annulaire
Date test 11/8/03 P 18/5/04 18/5/04 18/12/05 18/12/05 18/12/05 18/12/05 18/12/05 18/12/05 18/5/04
YAM 004 O NE GL OK OK OK OK OK OK OK OK OK OK 1
SCSSV BFX remplace le 13/01/2006.
Date test 20/12/03 P 13/1/06 19/5/04 19/5/04 19/5/04 19/5/04 19/5/04 19/5/04 19/5/04 19/5/04 19/5/04
YAM 005 O NE GL OK FU OK OK OK OK OK OK SANS OK 1
SAB modifi.Remplac SSV tbg le 07/07/03
Date test 21/12/03 P 19/5/04 19/5/04 23/12/05 23/12/05 23/12/05 23/12/05 23/12/05 23/12/05 19/5/04
YAM 006 O NE GL OK SANS FU OK OK OK OK OK OK 0 VM 1
Puits Eruptif ( Actuellement en production )
Date test 8/12/03 P 22/5/04 22/5/04 22/5/04 22/5/04 22/5/04 22/5/04 22/5/04 22/5/04
YAM 007 O NE GL OK OK OK OK OK OK OK OK OK OK 1
Date test 30/12/03 P 20/5/04 20/5/04 20/5/04 20/5/04 20/5/04 20/5/04 20/5/04 20/5/04 20/5/04 20/5/04
YAM 008 O NE GL OK OK OK OK OK OK OK OK OK OK 1
Vanne de SAS pas teste
Date test P 3/10/05 3/10/05 3/10/05 3/10/05 3/10/05 3/10/05 3/10/05 3/10/05 3/10/05 3/10/05
YAM 009 O NE GL OK OK OK OK OK OK OK OK OK OK 1
Date test 14/12/03 P 20/12/05 20/12/05 20/12/05 20/12/05 20/12/05 20/12/05 20/12/05 20/12/05 20/12/05 20/12/05
YAM 010 O NE GL LOT FU OK OK OK OK OK OK OK OK 1
Test tanchit vannes aprs graissage
Date test P 21/5/04 21/5/04 21/5/04 21/5/04 21/5/04 21/5/04 21/5/04 21/5/04 21/5/04 21/5/04
YAM 011 O NE GL OK SANS OK OK OK OK OK OK OK OK 1
Remplac SSV le 16/7/02.
Date test P 20/10/05 20/10/05 20/10/05 20/12/05 20/12/05 20/12/05 20/12/05 20/12/05 27/5/04
YAM 012 O NE GL LOT SAI OK OK OK OK FU BO SANS 0 SSV Annulaire
Date test P 20/12/05 1/2/06 1/2/06 1/2/06 1/2/06 1/2/06
YAM 013 O NE GL OK SAI OK OK OK OK OK OK SANS OK 1
Test tanchit vannes aprs graissage
Date test 24/5/04 P 5/9/04 5/9/04 5/9/04 5/9/04 5/9/04 5/9/04 5/9/04 5/9/04 5/9/04
YAM 014 O NE GL OK OK OK OK FU OK OK OK OK OK 1
VM1 : pas de volant.
Date test P 26/5/04 26/5/04 26/5/04 26/5/04 26/5/04 26/5/04 26/5/04 26/5/04 26/5/04 26/5/04
Etanchit des Vannes 100% 79% 93% 100% 86% 93% 93% 86% 100% 86% 79%
Nbre puits O 14 Nbre puits E 0
% vanne tubing conforme quand puits Eruptif 0 puits Eruptif
Figure 42: Exemple Tableau ETAT des Vannes de puits sur une plateforme (Rassemblant Test de fonctionnement et Test dtanchit)
CHAMP YANGA
PLATE-FORME YAF2
DATE 19/03/2006
RESPONSABLE DU TEST TATI-PAKA PUITS YAM220
VISA
SCSSV
57 8 8 10 Oui Etanche
fond
ASV 60 40 48 10 SAI
57 10 10 10 Oui Etanche
VANNE MAITRESSE N1
X-Mas tree
60 0 4 10 Oui Etanche
VANNE 1er CSG AUTO
Nant
VANNE 1er CSG MANUELLE OPPOSEE
Csg 2
25 0 0 10 Oui Etanche
VANNE 2nd CSG MANUELLE
25 10 10 10 Oui Etanche
VANNE MANIFOLD PRODUCTION
25 10 10 10 Oui Etanche
VANNE MANIFOLD TEST
Lgende
Figure 44: Extrait de la Company Rule CR EP FPP 135 "Barriers on Completed Wells"
Quel que soit le type de puits rencontr, il est obligatoire de monitorer la pression des
espaces annulaires. Et mme si la CR fixe une limite minimum, il est de bon ton de
contrler la pression des espaces annulaires hebdomadairement et plus si certains cas le
ncessitent.
Loprateur effectuera ces relevs de pression lors de sa tourne des relevs des
paramtres de fonctionnement des puits.
But :
Pour connatre les capacits dun puits produire, il faut le tester. Il y aura un premier test
du puits lorsque son forage sera termin et aprs lavoir dgorg. Les valeurs mesures
pour ce premier test dtermineront les capacits initiales du puits produire et serviront
de rfrentiel pour le Dpartement Productivit Puits pour suivre la vie du puits.
Il y aura ensuite des tests raliss selon une frquence dtermine par le Dpartement
Productivit Puits. Il est souvent demand davoir au moins un test par mois valid par les
Exploitants et le Dpartement Productivit Puits pour chaque puits.
Il convient donc de faire ces tests avec la plus grande rigueur car ayant beaucoup de puits
tester sur chaque site, la moindre rptition de test peut entraner un retard norme. Il
existe sur chaque site un planning de tests standard gr par les exploitants et rvis si
besoin est par le Dpartement Productivit Puits.
Moyens :
sur un compteur poly phasique (MFM) avec comptage des trois phases :
Certaines installations ne disposent pas de sparateur de test (manque de place
ou choix technologique) et les tests sont mens sur un compteur poly phasique.
Il est utilis comme son nom l'indique lors de tests. Que ce soit pour un suivi de la
production de chaque puits ou pour une analyse suite une anomalie, les mesures
effectues sur le sparateur de test sont importantes. Le but lors d'une telle intervention
est de dterminer le bilan matire, c'est dire de quantifier chaque phase de l'effluent
(gaz, huile et eau) pour chaque puits.
Dbit gaz.
On notera que les mesures effectues sur le sparateur de test ne sont utilisables que si
le puits est stable durant le test.
PC
FT
14"
Torche
Torche
10"
SBDV FT
14"
SDV KY511
14" SDV
Manifold
70 m
7 - 29 bar
LDC
40 - 60 C LC
Pour chacune des deux mthodes existe une procdure OPERGUID dcrivant
prcisment toutes les oprations effectuer afin de raliser un passage du puits en test
de manire idale.
Quand ?
Comment ?
Enregistrement de tous les dbits et tous les paramtres pour une analyse
complte des rsultats par Mthode Puits
FR % position duse
Au niveau puits
- Duse (mm) X
- Dbit liquide (m3/J) X
- BSW (%) X
- GOR (m3/m3) X
- P. moyenne tubing (bars) X
- Frquence affiche si VSD (HZ) X X
- Intensit moyenne (A) X X
- Intensit mini X X
- Intensit maxi X X
Recommencer le test
PC
Points FT
d chantillonnage
14"
10" Torche Torche
SBDV FT SDV
14"
SDV KY511
14"
Manifold SP
70 m3
7 - 29 bar
LDC
40 - 60 C LC
Quand on change la vitesse de rotation d'une pompe centrifuge, ses performances sont
modifies et il est impossible de prdire ces modifications.
Les lois qui grent la performance d'une pompe centrifuge quand la vitesse change sont
connues sous le nom de lois d'affinit (affinity laws).
Dbit RPM
H (RPM)
P (RPM)
A partir de points de la courbe standard (60 Hz) il est possible d'obtenir les points
quivalents la nouvelle vitesse pour des conditions hydrauliques peu prs quivalentes
(type dcoulement des fluides, pousse sur les impulseurs, rendement hydraulique)
N
Q Q1 x 2
N1
2
N
H 2 H 1 x 2
N1
3
N
P2 P1 x 2
N1
Q : Dbit
H : Hauteur de refoulement
P : Puissance fournir sur larbre
N : Vitesse (frquence)
Rendement du systme
Avec les pertes dans le cble lectrique de puissance et les pertes de charge par friction
dans la colonne de refoulement,
Head EFF
in feet pump
only
Plage de fonctionnement
50 Brake
Optimum
HP
Head capacity
40
80
Pump 70
efficiency
30 1.20 60
Brake
horsepower 1.00 50
20 .80 40
.60 30
Plage de fonctionnement
Figure 51: Plage de Fonctionnement d'une Pompe (Exemple pompe B.J. K. 70. 1 tage
pour d = 1
2000
MINIMUM
80 HZ
1600
Operating range
70 HZ
1200
60 HZ
800
50 HZ MAXIMUM
40 HZ
400
30 HZ
Pump type : L -500 RPM : variable (2 -ple MTR) Reference NO : C06 -89
gure 52: Plage de fonctionnement pompe Centrilift pour minimum 8 5/8 OD casing
A partir des points mini (1200 BPD) et maxi (-2600 BPD) de la plage de fonctionnement
recommande 60 Hz il est possible de dfinir les plages de fonctionnement
recommandes pour toutes les frquences (30 90 Hz) dans le cas prsent.
Si l'on souhaite produire un dbit important partir d'un casing de diamtre rduit, cela
oblige de fonctionner une frquence suprieure 50 Hz donc d'utiliser un variateur de
frquence.
Pour pomper des effluents visqueux ou contenant du sable, il est prfrable de fonctionner
frquence rduite pour prolonger la dure de vie des units.
2000
Maximum flowrate
60 Hz curve
1000
40 Hz
500
0
0 100 200 300 400
Flowrate in bottom hole conditions ( m3/d )
500 600 700
Downthrust Operating
range Upthrust
Free floating
impeller
Efficiency
Efficiency
0 2 4 6 8 10 12 14 16
Rate in GPM
7.6. EXERCICES
12. Lister sur un schma de puits activ par PCI les paramtres de fonctionnement
14. Quelle est la frquence de test fonctionnel et de leaktest des vannes de scurit
dun puits PCI ?
Cette mthodologie gnrale reprend les principes appliqus sur toutes les filiales du
groupe en matire doprations de puits, mais il convient de suivre les procdures
OPERGUID site qui font rfrence aux quipements rencontrs.
Augmenter la frquence
OUVERTURE PUITS
DEMARRAGE PRODUCTION
PRODUCTION
DEBIT HUILE
CIBLE AVEC
DEBIT MINIMUM GL
Diamtre de duse
Paramtres d'activation
Ouverture du puits
tanchit EA
Capteurs (PSHL..)
Dpts,
Emulsions,
Hydrates,
Corrosion
Analyse des manques produire (diffrence entre ce que le puits est cens produire et ce
quil produit rellement).
Assistance formation-expertise
producteur
injecteur
Suivi permanent des paramtres de chaque puits (P,T fond et tte de puits)
ligne de test
Gisement :
Exploitation :
Gisement :
Exploitation :
Paramtres puits :
Produits chimiques :
mthanol
corrosion : paisseur
Il existe une procdure OPERGUID propre chaque site quip du FCW permettant
dinitier le dmarrage automatiquement et dcrivant tout le squencement. Il convient,
pour loprateur, de connatre cette procdure afin de pouvoir suivre sur le SNCC ou
localement sur la zone puits la bonne mise en uvre du dmarrage et intervenir en cas
danomalie.
AUTOMATE
SUPERVISEUR
- PASSAGE CDES
Pf Centrale - MODIF. PARAMETRES
- HISTORIQUES
FCW
DEMARRAGE
DELESTAGE
REGLAGE SYSTEME HUILE
ESD
RESEAU GAZ
EXPEDITION
Pf
Satellite
8.3.1.1. Objectifs
Ameliorer:
LA FIABILITE
LES PERFORMANCES
Surveillance intensit
Respect de la LCT
Dlestages
Redmarrage en douceur
AMELIORER LA FIABILITE
BOUCHAGE
EFFORTS / BUTEES
RESPECT LCT
ARRET PCI
FERMETURES SEQUENTIELLES
COMMENT ?
CONDUITE ACTIVE
Sequences betonnees
CONTRLE ACTIF :
SUIVI INTENSITE
o Valeurs extrmes
o Ecart / I thorique
o Instabilit
PILOTAGE EN FREQUENCE
TEST
PUITS 3/4
PRODUCTION
PUITS 3/4
GX 101 GX 102
PT 151 000
ARRET SECURITE
DECOMPRESSION
TUBING CASING
DEMARRAGE PCI
MISE EN CHARGE PCI
(Q m ini F m ini)
PRODUCTION
L'INTEGRITE
ARRET SECURITE
Gestion hors FCW
PREPARATION PUITS
Fermeture RCV
PRODUCT ION
PRODUCTION
Etat "Production"
MONTEEENREGIME
Augmentation de la frquence
Fmini --->Fcible ou Fmulti si gestion multipuits
SURVEILLANCEACTIVE
Surveillance: Il faut:
Dfaut cart Intensit PTF<PTF/S3
Dfaut instabilit Intensit PTH/S3<PTH<PTH/S4
Qg/ea TTH/S1<TTH<TTH/S2
QHH/S3<QHH<QHH/S4
Calculs de dbit
Visualisation du point de fonctionnement
REGIMESTABLE
TAF001FM
DONNEES RESERVOIR
Z Ref Puits RS P de bulle T Gis gaz huile eau Bo Visco fd
626 14 48 45 0,650 0,913 1,07 1,01 10
CARACTERISTIQUES TUBING
POMPE MOTEUR A 50 HZ Cote Pompe
Marque Type Nb tages Hp V I ID " Tbg m vert. m fors C Tbg
REDA HN13000 41 350 2330 73 4 613 900 120
Cble AWG : 2
PARAMETRES DE REFERENCE
Date Q Gaz Csg Q Cible PTH GOR % EAU Frq Q Mini PG IP
9.4.98 15000 2400 20 150 0,95 64 1500 58 120
Efficacit dgazage : 90%
PARAMETRES DE FONCTIONNEMENT
Q Gaz Csg Q Hh PTH Frq
15000 2400 20 64
SUIVI DU POINT DE FONCTIONNEMENT
DELTA PTH PTF Efficacit % Gaz libre passant Charge Moteur
TDH bar bar dgazage dans la pompe
% Mesure Calcule Calcule Calcul Calcul
0,7% 20 37 90% 1,97% 77%
< 10 % STOP !! < 10 %. ALARME si 52% < % < 100%
PTF< 1 b Pb Compt ou GOR
Figure 62: Exemple de vue de conduite de puits PCI sur SNCC
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 103 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
GENERAL PUITS
2 PUITS 402 ETA T Sous-Etat 000 000 000 % 000 000 000 000 000
3 PUITS 403 ETA T Sous-Etat 000 000 000 % 000 000 000 000 000
4 PUITS 404 ETA T Sous-Etat 000 000 000 % 000 000 000 000 000
5 PUITS 405 ET AT Sous-Etat 000 000 000 % 000 000 000 000 000
6 PUITS 406 ETA T Sous-Etat 000 000 000 % 000 000 000 000 000
M ultipuits D le s tage
Redmarrage en douceur
Il existe une procdure OPERGUID propre chaque site quip du FCW ou pas
permettant dinitier le dmarrage manuel et dcrivant tout le squencement. Il convient,
pour loprateur, de connatre cette procdure afin de pouvoir suivre sur le SNCC ou
localement sur la zone puits la bonne mise en uvre du dmarrage et intervenir en cas
danomalie.
There are certain basic steps that must be done in sequence, (on after the other), when
opening a well to flow to the production stream. These step-by-step actions are taken for
the following reasons:
Safety.
Note: There will be small variations to these steps depending the wells you will
operate but the basic steps are the same.
Prior to OPENING
sinformer sur les caractristiques du puits ouvrir (N, puits gaz/oil, ruptif, PCI,
GL, BSW, GOR)
relever PEA1,2,3.
Opening/Startup Procedure
We will assume that all the valves on the wellhead are closed.
With the adjustable choke set to correct size or choke bean of correct size in
position, open the surface safety valve (second wing valve) slowly to allow flow
into the production header.
Relever tous les parameters de fonctionnement , une fois quils sont stabilizes et
commencer le well monitoring.
Arrter la PCI
CAUTION
Take great care and attention when opening and closing valves at all times.
Always inform the control room before putting wells on stream and ensure that all
necessary permits have been obtained.
There is always a differential pressure across a closed SCSSV. This is because of the gas
and fluid in the tubing above the valve and the increase in pressure below the valve (due
to the natural build-up of pressure from the well).
Pressure across the valve must be equalized before the valve is opened. There are
equalizing ports in the valves to do this.
Control line pressure is applied to the valve from the surface control panel.
The well head pressure is monitored as the control line pressure is slowly increased. An
increase in wellhead pressure will show when the equalizing ports in the valve have been
exposed.
The control line pressure is kept at the level that caused the equalizing ports to open.
When the wellhead pressure is stabilised, (no more increase in pressure over a 15 minute
period), we can say that there is no pressure differential across the SCSSV.
This equalizing action prevents any damage to the sealing elements of the valve.
As additional control line pressure is applied, the valve moves to the fully open position.
Control line pressure is maintained at the control panel to keep the valve in the fully open
position.
Note: Considerable damage can be done to an SCSSV when it has not been equalized
before applying full opening control line pressure.
Valve damage will not be known until the SCSSV is pulled from the well or until the SSV is
needed to perform its function in an emergency. IT WILL LEAK BADLY and there will be
NO ISOLATION from reservoir pressure in an emergency.
MODE
Instable Stable
Rponse Rponse
Transitoire
Temps Temps
Etat
Rponse Rponse
Stabilis
Temps Temps
Investigation prliminaire
Oprations spciales
SPP
Aide
Superintendant Performance
Puits
Conseils pointus
Coordination
SIP
Consolidation
Bonne observation
Bonne Utilisation
Le puits peut tre mis disposition pour certaines oprations dexploitation (ex : Test de
fonctionnement ou dtanchit vannes de scurit) ou de maintenance (ex : Nettoyage
TBG au Wire Line).
Ces oprations sont normalement planifies et le puits peut tre mis disposition selon
une procdure qui sera tablie par lExploitation en fonction des besoins. Sil sagit dune
mise disposition classique, on appliquera la procdure OPERGUID du site de fermeture
dun puits.
Pour la mise disposition du puits pour des oprations de wire line, il faudra connecter un
panneau de commande distance des vannes de scurit selon une procdure
OPERGUID du site.
Suite aux relevs des paramtres puits, loprateur a sous sa responsabilit de sassurer :
du bon fonctionnement :
o de tous les manomtres et leur vanne disolement (lisibilit, tanchit)
o de tous les thermomtres (lisibilit)
o des vannes manuelles de la wellhead & christmas tree (graissage, facilit de
manuvre, tanchit)
du contrle de :
o niveau rservoir armoire hydraulique de commande SCSSV / SSV
Loprateur devra donc faire une demande sa hirarchie pour une intervention de
maintenance sur le problme dtect.
Les interventions qui peuvent tre effectues sur un puits vont de mesures de fond au
rquipement de la colonne de production. Les moyens utiliss seront adapts au travail
effectuer.
Lgres :
o Descente de jauges de mesure, chantillonnage, logging
o Pose dun bouchon pour isoler par exemple une zone productrice
o Changement dune vanne gaz lift
o Ouverture/Fermeture dune vanne de circulation (Sliding Sleeve)
o Dpose et repose SCSSV
o Repchage de poissons
Un sas Lubricator fix sur la Christmas tree au niveau de la swab valve et quip
dun BOP et dun presse toupe dtanchit sur le cble
Presse toupe
Graisseur
hydraulique
Roller bar
Les coulisses
Figure 71: Coulisse Figure 72: Coulisse tubulaire Figure 73: Coulisse
mcanique hydraulique
Elles sont gnralement ralises sur un puits en arrt de production mais nanmoins
sous pression.
Lacidification
Une unit de Coiled Tubing est constitue dun tube mtallique continu de 1
enroul sur un tambour, le Coil. Ce tube est muni dun clapet anti-retour son extrmit
et est manuvr par un injecteur quip dun BOP. Il peut donc tre descendu dans un
puits en pression.
Le Coiled Tubing,
grce la souplesse
du tube, est plus
avantageux que le
Snubbing dans le
sens quil offre une
mise en uvre plus
rapide, la possibilit
dintervenir dans des
drains horizontaux et
permet galement de
forer des drains de
plus petit diamtre.
V e n t L in e
S h a k e r U n it C e n trifu g e
U n it
D e g a sse r
F re e S ta n d in g
R ig T a n k s
In je c to r H e a d A sse m b ly
ne
Li
w
n F lo
tu r
Re F lu id P u m p U n it
F lu id P u m p U n it
C h o k e M a n ifo ld
C .T . R e e l
Ki
ll L
in e
Raliser un Gas Lift temporaire pour pratiquer un essai en attendant une reprise
de puits
8.7.2.2. Le Snubbing
Il consiste la descente dans un puits en pression de tiges visses (Tubing) munies dun
clapet de fond lintrieur du Tubing de compltion existant.
Par rapport au Coiled Tubing, il offre une meilleur capacit de dbit, plus de traction et de
rotation ainsi que la possibilit de mettre du poids sur loutil.
Il est en revanche plus long par le fait quil faut visser les tubes entre eux et faire passer
chaque connexion travers le systme dtanchit.
Effectuer des
repchages
Mettre en place un
Tubing permanent
pour linjection
dinhibiteur, de Gas
Lift
Pour des interventions qui ncessitent par exemple de remonter le Tubing, on fait appel
des units lourdes telles des units de Pulling, voir plus importantes de Work Over.
Ces interventions ncessitent de tuer le puits en mettant en place un fluide qui exerce
une pression hydrostatique suprieur celle du gisement.
On utilise les units de Pulling pour des profondeurs allant jusqu 2500m environ. Ce
sont des appareils lgers et mobile mis en place rapidement sur la tte de puits.
pressions,
tempratures,
niveaux,
nature,
Les mesures dans le puits permettent aussi de contrler l'tat du puits par la mesure :
On appelle "mesures associes", gnralement de surface, toutes les mesures que l'on
effectue en mme temps que la mesure de fond et qui sont indispensables la validation
de celle-ci.
Remarque
Matriel de surface
Proscrire tout quipement fuyard. Un stuffing box ou une vanne qui fuit, dtriore
la mesure.
Rapports
Pour un puits PCI, il est difficile de pouvoir chantillonner en fond car la pompe ne permet
pas daccder au fond du puits. Par contre, si la pompe est place sous le niveau des
perforations il est possible mais rare de pouvoir chantillonner.
But
Recueillir un volume de l'effluent tudier, suffisamment petit pour qu'il puisse tre
commodment prlev, mais suffisant pour tre soumis aux diverses exprimentations et
analyses. (600cc par chantillons)
But :
Ces analyses ont pour but de faire l'inventaire des corps contenus dans les diffrents
fluides. Elles concernent en premier lieu les eaux de gisement.
Ces analyses ont pour but d'identifier les germes bactriens contenus dans l'eau, pouvant
entraner des dgradations importantes du matriel.
Conditions
Si l'chantillon recueilli au fond du puits n'est pas obtenu dans de bonnes conditions les
mesures effectues au laboratoire ne seront pas reprsentatives du complexe du
gisement.
Puits
Le puits doit tre prpar avant son chantillonnage. Il faut souvent le faire produire
faible rgime, stable. Cette stabilit sera vrifie par la mesure des dbits d'huile et de gaz
pendant 48 h avant l'chantillonnage.
L'chantillon doit tre prlev le puits tant mis en dbit, ce mme dbit que
prcdemment (laminage).
La cte de prlvement doit tre la plus basse possible, celle parcourue par tout
le fluide de la couche.
Echantillonneur
But
En gnral, il est possible d'chantillonner peu de frais, le fluide le plus lourd rencontr,
que le puits soit en dbit ou ferm.
En cours de production, les tubings qui quipent un puits peuvent tre soumis des
phnomnes :
de corrosion,
d'rosion,
de dpts.
Pour contrler les effets de ces phnomnes sur les tubings, principalement corrosion ou
rosion, il suffit de vrifier leur diamtre intrieur l'aide d'un outil : le CALIPER.
Ces mesures sont gnralement ralises avec les capteurs intgrs de la PCI en place.
ll est difficile de pouvoir mesurer au droit des perfos en fond car la pompe ne permet pas
dy accder.Par contre , si la pompe est place sous le niveau des perforations il est
possible mais de pouvoir faire les mesures avec une jauge descendue au wireline.
Lors dune mesure de Pression en dbit, dun Back Pressure Test ou dun Flow Gradient
survey, il est trs important de diriger le puits en question lors de lopration vers le
sparateur de Test pour pouvoir comparer les donnes mesures.
Pression en Dbit:
Appel aussi Multi Rate Production Logging Tool (MRPLT). Mesure de dbit de production
associe la mesure de pression et temperature pour chaque niveau perfor et pour
differents dbits de production. Cet outil de logging est positionn la profondeur de
chaque niveau perfor avec une unit de wire line.
Cette mesure est gnralement associe une remonte de pression (voir ci aprs) et
sappelle donc PDRP.
Identique au PDRP mais avec les jauges installes sur un sige dancrage spcifique.
Cela permet seulement de mesurer le dbit total produit par les niveaux situs en dessous
du sige.
Identique au PDRP mais avec les jauges remontes par paliers pour un dbit donn du
fond de puits jusquen surface pour dtecter toute injection de gas lift incontrle (trou
dans le tubing)
Le taux de production est en effet accru par une meilleure permabilit de la roche
rservoir jouxtant le trou.
La roche est broye par laction du forage et les fluides de forage sintroduisent dans la
formation.
Lendommagement se produit en grande partie dans un rayon dun pied du trou du puits.
Plus la permabilit est leve, plus le passage des fluides dans la roche est facile.
Plus la permabilit est faible, plus le passage des fluides dans la roche est difficile.
La plupart des traitements acides intgrent lune des trois classifications gnrales :
Nettoyage de puits,
Acidification matricielle,
Fracturation.
Lacidification matricielle consiste une injection minutieuse dacide par pompage dans
la formation de faon ce quil pntre les espaces poraux sans fracturer la roche
rservoir. Cette procdure est en rgle gnrale ralise pour la dissolution de la boue et
des contaminants de forage dans les formations liaison couche-trou tendres.
La fracturation ncessite linjection dacide des dbits plus rapides que ne peuvent
supporter les chemins dcoulement naturel jusqu ce que la roche rservoir se fracture
ou se fende. En cours de traitement, lacide traverse les fractures et dissout la roche,
formant des alvoles et chemins supplmentaires travers la paroi.
Les deux acides les plus frquemment utiliss pour la stimulation de circulation dhuile
dans les puits sont les suivants :
Aprs dissolution des roches magasin et des contaminants par ces acides, les produits de
cette raction chimique doivent tre solubles.
Si les produits de raction ntaient pas solubles, les matriaux solides produits
obtureraient et colmateraient les espaces poraux dans la roche rservoir, cela rduirait la
permabilit au lieu de laugmenter.
Le mlange dacides et dadditifs est spcifiquement tabli pour chaque puits et pour
chaque type de formation.
Les pressions et volumes de pompage sont de mme spcifiquement tablis pour chaque
formation.
Diffrentes substances chimiques sont associes au mlange acide de base inject par
pompage dans le puits. De nombreux additifs diffrents sont utiliss pour diverses raisons.
Lobjectif est prcisment lattaque de la roche rservoir et de ses contaminants par lacide
et non celui dattaquer les quipements de compltion. De mme, il ne doit pas tre utilis
(us) avant de stre correctement log dans la formation.
Inhibiteur de corrosion
Les retardateurs qui retardent laction de lacide afin de lui permettre datteindre
le lieu daction prcis souhait.
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 129 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Les rducteurs de friction qui rendent le mlange acide plus 'glissant' et donc
plus facile pomper.
Il existe des billes de plastique durci ou de caoutchouc plein prsentant une flottabilit
neutre. Elles ne flottent pas dans lacide.
Les billes Perf-Pac sont injectes par pompage dans le puits avec lacide diffrents
intervalles au cours de laction de lacide.
Les billes Perf-Pac accompagneront lacide injecte par pompage et condamneront les
perforations surdimensionnes recevant facilement lacide. Elles forceront ainsi la
circulation de lacide dans les perforations plus difficiles ou de dimension moindre.
Une fois la stimulation dacide termine et le pompage arrt, les billes Perf-Pac
tomberont dans le fond du puits.
Comme il est dcrit plus prcisment dans le chapitre suivant, le puits peut tre soumis
des dpots, des problmes de corrosion interne, des phnomnes physiques perturbants
pendant le transit du fluide du fond vers la surface.
Tous ces problmes peuvent tre limins, sinon attnues, de faon permettre au puits
de produire de manire stable.
Leffluent du gisement est analys au tout dbut des tudes de dveloppement afin de
dterminer, en conditions de fonctionnement (en pression et temprature) quels seront les
problmes que lon sera amen rsoudre (ex : possibilit de formation de dpts de
carbonates, dhydrates, prsence dH2S dans leffluent pouvant crer des problmes de
corrosion,etc.) .
Une fois les problmes possibles annoncs, il sera dvelopp un programme dinjection
de produits chimiques dans le puits (en fond et/ou en surface).
Pour ce faire, une installation spcifique sera mise en oeuvre sur le site, comprenant les
tanks de produits avec leurs pompes doseuses associes.
Cette installation reprsente souvent une norme quantit de matriel (fonction du nombre
de puits du site traits) et est un lment essentiel monitorer.
Le cot des produits chimiques reprsente une part trs importante des frais
dexploitation.
Donc, un mauvais monitoring peut entraner un surcot norme car la dure de vie du
puits peut sen trouver fortement affecte et les interventions lourdes ou lgres psent
dans les frais.
La fonction injection produits chimiques est une fonction vitale pour la production
Rgles :
Une pompe qui tourne nest pas forcment une pompe qui injecte (dsamorage,
retour soupape)
Point
Point Point dinjection
Prvention Produit
Fonction dinjection sur dinjection sur sur Water
des inject
PCI well GL well injection
well
Limiter dpts
de paraffines.
Paraffines Anti paraffines Aspiration PCI Dans EA1 non
Dispersant de
paraffines
Rduire la
Emulsions Dsmulsifiant viscosit des Aspiration PCI Dans EA1 non
mulsions
Limiter dpts
Inhibiteur de
Carbonates dans jupe PCI Aspiration PCI Dans EA1 Amont puits
dpts
ou dans TBG
Empcher la
Inhibiteur
Hydrates formation non non non
dhydrates
dhydrates
Elimination des
Bactries Bactricide non non Amont puits
bactries
Empcher la
Inhibiteur de
Asphaltnes formation de Aspiration PCI Dans EA1 non
dpts
dpts
Empcher la
Dpts sulfate Inhibiteur de Rare
formation de Dans EA1 non
baryum dpts Aspiration PCI
dpts
Table 3: Produits injects, leur fonction et leur point d'injection selon le type de puits
CONSIGNES TRAITEMENT
"SEPTEMBRE 2006"
Figure 85: Exemple de consignes d'injection de produits chimiques selon type de dpts IDOS 162
Figure 86: Exemple de prconisations dinjections de produits sur puits / manifold (1)
Figure 87: Exemple de prconisations dinjections de produits sur puits / manifold (2)
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 135 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Figure 88: Exemple de prconisations dinjections de produits sur puits / manifold (3)
8.11. EXERCICES
17. Lister les squences dun arrt manuel dun puits PCI avec commande de chaque
squence par loprateur de conduite
18. Lister les principaux problmes rencontrs sur un puits PCI pour lequel une
injection chimique est ncessaire.
9. TROUBLESHOOTING
Prendre en compte les effets induits en cascade et les interfrences, par exemple :
augmentation du Qgi, modification dbit injection produit chimique.
Dtection
Actions
Prvention
Alerte
Propositions
pas de prcipitation
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 144 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Mesures de qualit
fiables
plusieurs graphes si ncessaire (ex. : vue par puits + vue PCH + vue duse)
Reporter les observations chaud par lobservateur initial sur les enregistrements, y
compris copie cran poste de supervision
Augmentation TTH
Gain huile associ
la stabilisation
Stabilisation du puits
suite remise en service
injection TY
Puits
(rservoir prod.)
Dsignation
pompe et
moteur
lectrique
Dbit
H+E
(m3/j)
BSW (%)
P. fond
avec cte
(b-mv)
P. tbg (b)
P. csg (b)
Frquence
(Hz)
Intensit (A)
Observations
Au niveau puits
- Duse (mm) X
- Dbit liquide (m3/J) X
- BSW (%) X
- GOR (m3/m3) X
- P. moyenne tubing (bars) X
- Frquence affiche si VSD (HZ) X X
- Intensit moyenne (A) X X
- Intensit mini X X
- Intensit maxi X X
La production se fera par la ligne dgalisation de la SCSSV (si la SCSSV en est quipe),
soit typiquement seulement 10% de la production normale du puits.
PTH
1 mn
(Bars) 48 b
43 b
fermeture 17h23
vanne
latrale
8b
17h22
(17/02/95) Temps
Figure 97: Exemple de Pecorade - France
Quand la deltaP travers lobturateur de la SCSSV est rduite, la chemise peut alors
ouvrir lobturateur de la SCSSV : suivant les modles, ce sera un clapet (flapper) ou un
boisseau (ball valve) qui est maintenu ferm par un petit ressort.
On observera en tte de puits, une monte plus rapide de la pression qui se stabilisera.
Evidemment, si on rouvre les vannes de tte puits avant la fin de la squence douverture
de la SCSSV, la production se fera par la ligne ou clapet dgalisation seulement.
Dans le cas du champ de Baudroie (Gabon) avec une huile paraffinique, les historiques
permettent avec la fonction zoom de dtecter le problme.
Si une SSCSV (storm choke) est installe, le risque de fermeture lors de bouchons est
encore plus grand.
Le risque est accru sur les puits avec des paraffines et de lmulsion. Des dpts peuvent
aussi empcher la chemise de la SCSSV de manuvrer correctement et de protger
lobturateur.
Cela peut se dtecter aussi par une monte de la pression casing jusqu galisation avec
la pression rseau gas lift (alors quavant la pression casing tait bien infrieure).
Elle peut varier de plusieurs semaines plusieurs annes selon la qualit abrasive du
fluide et la temprature du puits.
Les estimations provenant de diffrentes sources indiquent une anne dans les conditions
sableuses. A 3 ans, dans les rservoirs carbonats.
En off shore, en puits dvis et gros dbits (600/1200 m3/jour), la dure de vie est en
gnral < 8 mois.
Il ressort quand mme quune grande partie des erreurs humaines doperating et surtout
de surveillance des paramtres de fonctionnement soit lorigine de la fin de vie des PCI.
Un manque dattention mme trs court sur un comportement de PCI peut avoir des effets
irrversibles et entraner un remplacement de celle-ci.
Le moteur essaie dentraner la pompe la vitesse qui lui est impose par le variateur.
si P augmente , I augmente
si P diminue , I diminue
Une intensit faible peut provoquer un chauffement du moteur. Pour une pompe dbit
nul, I faible. Cependant le moteur va chauffer et risque de griller car il n'est pas refroidi.
Dpendant de la quantit de gaz libre qui passe dans la pompe, on peut avoir une lgre
interfrence ou le gas lock.
La prsence de gaz au niveau de la pompe est indique sur l'ampremtre de surface par
des variations rapides de la charge du moteur.
Le gas locking se produit quand la pompe absorbe trop de gaz et s'arrte de pomper par
ce que sa hauteur de refoulement disparat. Le moteur n'est en charge et s'arrte par
underload.
Si le pourcentage de gaz libre prsent dans l'effluent total est trs important (90 95%),
cette valeur n'est pas accessible au pompage centrifuge conventionnel.
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 154 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Plus de refroidissement
dP = MV X H X g dP fourni diminue
Cela permettra de raliser la sparation gravitaire gaz produit. L'vacuation du gaz se fait
par lannulaire.
Dans ces conditions, il est vraisemblable que l'on pourra arriver des % de gaz libre
rsiduel qui permettront d'utiliser des pompes centrifuges condits de les quiper d'un
dgazeur centrifuge.
La pompe est positionne sous les perforations. Pour forcer l'effluent passer devant le
moteur lectrique pour le refroidir, une colonne intermdiaire ou une jupe est ncessaire.
Exemple 1
Bon Fonctionnement
Pompe surdimensionne. Arrt de la pompe
par sous charge suite perte de la
submergence. La pompe na plus de liquide Pompe
aspirer surdimensionne
Exemple 2
Amprage
Temps
PCI Amprage de PCI
Prsence gas
Figure 100: Cas de sysfonctionnement de
PCI (2)
Amprage
PCI Amprage de PCI
Temps
Bon Fonctionnement
Exemple 3
Temps
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 156 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Exemple 4 Amprage
PCI Amprage de PCI
Perturbations lectriques. Le dmarrage dun
autre moteur lectrique perturbe le rseau et
le moteur de la PCI Perturbations rseau lectrique
Exemple 5
Amprage
PCI Amprage de PCI
Temps
Temps
Figure 104: Exemple de dfaut de manipulation (fermeture duse TDP) entrainant des dommages la pompe (T PCI) suivi dun arrt.
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 158 de 194
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Squence redmarrage avec dcompression casing Surveillance attentive puits sensibles aprs
Gaz
la consigne AVANT redmarrage de la pompe. redmarrage ET en continu
Engorgement par manque de
Majeure (*) Ouverture et contrle ouverture ASV Amprage instable
ventilation (AGH ne rsout
Arrt de la pompe en cas de dfaut sur la ventilation du Dbit gaz ventil anormal
pas tout !!)
gaz (fermeture vanne en aval) Cas grave : arrt puis redmarrage du puits
Gaz Injection additifs requis en fond de puits Surveillance attentive cuve et pompe
(difficult sparation gaz Majeure (*) Dbit d'injection continu Risque de dsamorage (puits sensibles)
moussage, mulsion, etc.) Arrt lors d'un arrt de puits Remplissage cuve
Charge excessive
Limiter la production cible (duse & Hz) notamment
(variation qualit fluides, IP, Majeure (*) Surveiller l'intensit consomme
en phase redmarrage (visqueux-froid & bouchon)
viscosit et contre pression)
(*) Consquence majeure = Endommagement de la chane de pompage conduisant une "cause" et au minimum une rduction de la dure de vie
Env. 25 MCFA / mois gagn
La faon doprer affecte lusure des ensembles de pompage donc leur dure de vie.
Le cot de remplacement des pompes PCI est trs lev : plus de 1 Million de $
Amliorer la conduite des PCI contribue rduire encore plus les interventions pour
changement de pompe et donc les OPEX.
Enjeux qualit des oprations des puits activs par ESP : Protger la chane de
pompage
Rduire les MAP visibles, utiliser le potentiel maxi ou compenser des MAP ne signifient
pas oprer mieux et gagner plus :
o htrognits rservoir
o coning
o problmes potentiels
Attention aux fermetures intempestives ou ouverture incompltes des STV surtout lors de
redmarrage ou avec production par bouchons
Prendre en compte les effets induits en cascade et les interfrences, par exemple :
augmentation de la frquence, dgazage, efficacit pompe, dbit produit.
Les sulfates.
Les carbonates.
Les sulfates proviennent d'un mlange de deux eaux. L'une avec des alcalino-terreux
(baryum, strontium, calcium) et l'autre avec des sulfates (SO4). Le dpt se constitue donc
au moment du mlange et une de ses caractristiques principales est une cintique de
formation immdiate.
D'une manire gnrale, les sulfates alcalino-terreux ne sont pas solubles par les acides.
Bien que les carbonates soient trs solubles dans les acides, c'est une solution qui sera
trs peu utilise, car la solubilit est accompagne d'un dgagement de CO2 ce qui
reprsente une contrainte
importante vis--vis de la
corrosion.
Les inhibiteurs de
carbonates peuvent tre
injects en continu en
amont du lieu de dpt
(mais cela ncessite un
liner dinjection si le dpt
se forme dans le tubing)
Lautre solution est
deffectuer un squeeze
dans la formation
Quand du gaz sec est utilis pour le gas lift et cause de son point de rose, linjection de
gas lift favorise la vaporisation de leau de production ce qui augmente la saturation en
sels et minraux.
Les risques augmentent de dpts de sels et de carbonates prs du point dinjection dans
le tubing et mme dans la vanne de gas lift.
Linjection deau ou dinhibiteur de carbonates dans le gas lift peut tre une solution
prventive.
Dans le tubing, les carbonates peuvent tre enlevs par dcapage leau avec unit de
coiled tubing (ou mme avec une solution dacide actique)
Il s'agit l d'un dpt qualifi d'exotique. C'est en fait un organo-minral qui ne se forme
que dans des eaux basiques telles que celles que nous avons au Cameroun ou au
Nigeria.
Les hydrocarbures sont en condition supercritique dans le rservoir. Leur vacuation vers
la surface provoque alors une sursaturation des alcanes les plus lourds. On distingue deux
catgories principales parmi les dpts organiques :
Les paraffines.
Les asphaltnes.
Les asphaltnes sont les composs aromatiques les plus lourds (>C100), et leurs
molcules sont longues et plates. Le dpt d une floculation des molcules
asphaltniques collodales intervient en gnral l o le point de bulle est atteint.
Toutefois, les conditions de formation des asphaltnes ne sont que trs peu matrises
aujourd'hui. De plus on notera qu'ils ne sont que trs rarement solubles dans les alcanes
lgers et par consquent il n'y a pas d'effet rtroactif.
Les remdes utiliss consistent en des traitements chimiques par injection de produits
comme de l'acide actique ou par des grattages au xylme ou encore par des squeezes
au DSA 700.
9.3. LEMULSION
Lmulsion est favorise par le ratio gas lift inject / huile mais aussi par les impulseurs
des PCI. Le risque est plus fort avec un BSW lev, un brut paraffinique, la production de
sable, une injection dinhibiteur de corrosion, une production de condensats.
De plus, pour le gas lift, laugmentation de la contre pression dans le tubing rend plus
difficile ou mme impossible le transfert de linjection gas lift la vanne de service.
Une mulsion forte, si elle na pas t prvue, peut empcher une pompe PCI de dbiter.
Il faut dans ce cas, prvoir une injection par liner de dsmulsifiant laspiration de la
pompe.
Lmulsion rend difficile la sparation eau / huile spcialempent piur les brut paraffiniques.
Cela peut induire de plus fortes teneurs en hydrocarbures dans leau rejete.
Une mulsion svre induit aussi du moussage et des difficults de sparation gaz -
liquide. Cela peut entrainer des risques de dclenchement de sparateur, ou induire un
carry-over de lhuile avec le gaz ce qui peut affecter la qualit du fuel gas.
9.4. LA CORROSION
Comment ?
L'eau.
Le temps.
Le facteur temps.
La notion de temps est importante vis--vis de la corrosion, car suivant la dure avant
nuisance, on aura un comportement diffrent.
De six mois deux ans, la cause principale est le CO2 sur le tubing ou autres
installations.
De dix vingt ans, la corrosion ne concerne que les structures et non les puits, du
moins pas de manire gnante d'un point de vue conomique (tubing rentabilis).
La prvention
Une fois le risque probable de corrosion identifi, le choix du mode de prvention reste
dfinir.
Actions sur le procd (contrle du BSW, traitement du gaz en H2S et CO2), mais
qui demande une rflexion lors du design des installations. On notera qu'en ce qui
concerne le puits proprement parler, il faudra attendre les puits intelligents
(sparation en fond de puits).
D'une manire gnrale, on prfrera la solution non corrosive, car il s'agit d'une mthode
passive sans besoin d'intervention en production et peu coteuse par rapport un work-
over corrosion.
9.5. LE CONING
Si la drawdown est excessif, du gaz libre (de la zone du gas cap) peut tre aspir dans le
tubing.
Le coning gaz se produit quand linterface gaz / huile est proche du niveau des
perforations. Il est d au fait que le gaz a une viscosit plus faible et se dplace plus
facilement que les liquides. Quand le coning gaz est initi, la PTH augmente
significativement.
Cest confirm ensuite en dirigeant le puits vers sparateur de Test et en constatant une
plus forte valeur du GOR.
Le dusage du puits est inefficace, car le rsultat final sera la production seule du gas cap.
Si un coning gaz est initi, la seule solution est de fermer le puits pendant quelques
heures (parfois quelques jours). Le puits sera redmarr avec une ouverture progressive
de la duse de production et il sera stabilis un dbit de production plus bas.
En cas de drawdown excessif, le coning eau peut survenir. Il survient gnralement sous
les mmes conditions. Le risque augmente avec un aquifre actif ou avec maintien de la
pression rservoir par injection deau.
Dans le rservoir, leau est moins visqueuse que lhuile et pourra se dplacer plus
facilement. Le coning deau est dtect par une augmentation de la TTH et une lgre
baisse de la PTH. La vrification du BSW le confirmera (hausse importante).
Si un coning deau est initi, la seule solution est de rduire la production afin dobtenir un
BSW compatible avec les installations.
Cela nous permet de produire normalement le puits jusqu ce que le niveau dinterface
huile / eau atteigne le niveau des perforations. En cas de BSW trop haut, il faudra ensuite
boucher ces perforations et perforer plus haut si possible ou abandonner le puits.
La situation devient plus complique avec plusieurs couches de production, comme leau
peut tre produite par nimporte quel niveau et pas forcment au fond du puits. La seule
solution dans ce cas serait darrter cette entre deau par installation dun casing patch
(si on a accs au casing) ou
essayer de water shut off par
injection dun gel spcifique.
Au fur et mesure de
lextraction de lhuile du
rservoir, le gaz au-dessus de
lhuile (le gaz cap) se dilate et
occupe lespace disponible.
Rapidement, linterface
gaz/huile se situera au niveau
de la zone des perforations et
le gaz accompagnera la
production de lhuile.
La production de sable est augmente par les modes de production instables, les
bouchons gnrs, de fortes et rapides variations de la pression en fond de puits (grosses
variations du drawdown).
Erosion
Bouchage du puits
Corrosion
Emulsion
Erosion
Une faible vitesse est suffisante pour induire de lrosion, de fortes vitesses par exemple
sur les puits gaz augmentent lrosion. La partie la plus expose est le coude en aval de
la duse de production (ainsi que la duse elle-mme).
Le coude peut tre quip dun T pour casser leffet de jet. Des quipements spcifiques
sont disponibles pour rduire lusure des internes de la duse (internes en carbure de
tungstne).
Dpendant de la production du puits, une partie du sable peut rester en fond de puits car
la vitesse des fluides produits nest pas suffisante pour les remonter (cest en fond de puits
que la vitesse est la plus basse). Laccumulation de sable va remplir la partie basse du
puits et couvrir les perforations rsultant en une dgradation de lIP.
Bouchage de flowlines
Le sable va aussi saccumuler dans les flowlines si la vitesse des fluides diminue. Il est
important de racler frquemment les flowlines en cas de production de sable pour limiter
les quantits recueillies par le racleur et viter son blocage dans la flowline.
Corrosion
Emulsion
La prsence de particules de sable rend difficile la sparation huile eau spcialement pour
les bruts paraffiniques: les particules lgres se trouvent linterface huile eau.
9.9. LE COLLAPSE
Deux types de collapse doivent tre vits. Les deux ncessitent un work-over pour
rparer:
Aprs la compltion initiale ou un work over, le casing peut tre rempli de fluide annulaire
jusquen haut du casing.
Lannulaire est un espace clos entre la tte de puits et le packer si le puits na pas de
vannes gas lift ou de soupape.
Ce risque est moins frquent. Il survient quand la rsistance actuelle du casing ne peut
plus rsister aux constraintes de pression malgr les rgles de design qui considrent des
marges de scurit.
Lors de la premire mise en service du puits, lannulaire de production est rempli deau
inhibe. Il y a donc une contre pression (poids de colonne) prsente dans cet espace
annulaire pour viter le collapse d une forte pression dans lespace annulaire n2.
Lors de lactivation par gas lift, ce poids de colonne est remplac par la pression
dinjection du gaz.
faire durer la situation actuelle. Pour cela, le gas lift sera exclu sur certains
puits. La scurit par rapport au collapse dpend uniquement de loprateur.
chantillonnage du puits
hydrates
Phase de perturbations :
delta P duses
Temprature
Pression rseau)
estimation par DCS dbit partir de la dP duse (calcul par logiciel puits/rseau)
Mesure directe des dbits de puits par test individuel de puits sur le sparateur de
test
meilleur prcision : 2 5 %
Lchantillonnage
Objectifs :
Stratgie :
difficults opratoires
reprsentativit de l chantillon
9.12. EXERCICES
19. Citer quelques problmes frquents rencontrs sur le fonctionnement dun puits en
gaz lift
10. GLOSSAIRE
Figure 38: Vue SNCC dun puits PRODUCTEUR ACTIVE par PCI avec son logigramme
scurit .......................................................................................................................71
Figure 39: Extrait de la spcification gnrale TOTAL GS EP SAF 226 -3 Typical
shutdown action matrix ............................................................................................72
Figure 40: Schmatisation dun wellhead control panel.....................................................73
Figure 41: Extrait de la Company Rule CR EP FPP 135 - "Barriers on Completed Wells" 74
Figure 42: Exemple Tableau ETAT des Vannes de puits sur une plateforme (Rassemblant
Test de fonctionnement et Test dtanchit).............................................................75
Figure 43: Exemple de Feuille de rsultats de Test dtanchit.......................................76
Figure 44: Extrait de la Company Rule CR EP FPP 135 "Barriers on Completed Wells" ..77
Figure 45: volution huile, BSW et GOR en fonction du temps .........................................78
Figure 46: Sparateur de test ............................................................................................79
Figure 47: Historique durant les tests ................................................................................80
Figure 48: Informations releves test de puits ...................................................................81
Figure 49: Problme au courant dun test ..........................................................................82
Figure 50: Points d'chantillonnage la tte de puits, au manifold ou au sparateur .......82
Figure 51: Plage de Fonctionnement d'une Pompe (Exemple pompe B.J. K. 70. 1 tage
pour d = 1 ...................................................................................................................84
gure 52: Plage de fonctionnement pompe Centrilift pour minimum 8 5/8 OD casing ......85
Figure 53:Exemple de plage de fonctionnement................................................................86
Figure 54:Efficacit par type dimpulseur ...........................................................................86
Figure 55: Squences logiques monopuits ........................................................................89
Figure 56: FCW Description Gnrale ...............................................................................94
Figure 57: Vue Systme marche / arrt FCW ....................................................................98
Figure 58: Logique FCW monopuits PCI ...........................................................................99
Figure 59: Arrt scurit FCW .........................................................................................100
Figure 60: Mise en production FCW ................................................................................101
Figure 61: Production FCW .............................................................................................102
Figure 62: Exemple de vue de conduite de puits PCI sur SNCC .....................................103
Figure 63: Exemple de vue de conduite de puits PCI sur SNCC .....................................104
Figure 64: Comportement transitoire du puits..................................................................109
Figure 65: Double cl pour matriser le puits et fermer la boucle.....................................111
Figure 66: Equipements de wireline.................................................................................113
Figure 67: Treuil d'une unit wireline ...............................................................................114
Figure 68: Sas Lubricator d'une unit wireline ...........................................................114
Figure 69: Douilles de cble ............................................................................................115
Figure 70: Tige.................................................................................................................115
Figure 71: Coulisse mcanique .......................................................................................115
Figure 72: Coulisse tubulaire ...........................................................................................115
Figure 73: Coulisse hydraulique ......................................................................................115
Figure 74: Outil de nettoyage - "Gauge Cutter" ...............................................................116
Figure 75Outil d'emboutissage - "Swagging Tool" ...........................................................116
Figure 76Bloc d'impression - "Impression Block".............................................................116
Figure 77: Hrisson - "Scratcher" ....................................................................................116
Figure 78: Outil de repchage - "Pulling Tool" .................................................................116
Figure 79: Coiled Tubing Unit ..........................................................................................117
Figure 80: Equipements dune unit Coiled Tubing Unit ..................................................118
Figure 81: Unit de snubbing...........................................................................................119
Support de Formation EXP-PR-PR040-FR
Dernire Rvision: 12/05/2007 Page 185 de 195
Exploration & Production
Le Process
Le Puits activ par Pompe Centrifuge Immerge
Leffluent est soumis une force centrifuge dans limpulseur de la pompe (associe
en fond de tubing) en rotation qui le projette dans le diffuseur. Le diffuseur va
transformer lnergie cintique acquise en gain de pression avant de diriger
leffluent vers limpulseur suivant. Lensemble impulseur diffuseur constitue un
tage de pompe. Le nombre dtages de la pompe sera dtermin en fonction du
gain de pression requis pour refouler leffluent en tte.
TTH
PTH
SSV
Qgaz ventil
SCSSV
(& SAV)
Refroidissement
du moteur par le
fluide pomp
P refoulement
P
P aspiration PTB (ou
M BHFP) PG
Cote perfos
gaz
PTH
PCH
Duse
SAV Huile + Eau
SCSSV (+ gaz)
Zone d interface
et niveau liquide
Moteur
et P. refoul. Sous
gaz refroidisst les
huile Pompe perfos
centrifuge
eau IP immerge
Pg P. aspir.
Exemple
Distribution 380 ou 410V 3 X ( 0 410V 574 V)
(5,5 ou 20 kV) soit 0 1230 1522 V
Moteur
lectrique
Dbits importants
Simplicit de conception
Peu encombrant
Bon rendement (35 60%)
Pas de nuisances
Facile oprer
Possibilit dinstaller des capteurs pour mesurer la pression de fond
Peut tre installe dans un puits dvi condition dtre dans une partie
rectiligne
Cot faible pour de gros dbits
12. Lister sur un schma de puits activ par PCI les paramtres de fonctionnement
14. Quelle est la frquence de test fonctionnel et de leaktest des vannes de scurit
dun puits PCI ?
sinformer sur les caractristiques du puits ouvrir (N, puits gaz/oil, ruptif, PCI,
GL, BSW, GOR)
sinformer de lexistence ou pas dune procdure OPERGUID pour le dmarrage
prendre consignes particulires auprs hirarchie
demander autorisation SDC pour aller prparer le dmarrage du puits.
faire un check /statut du puits (prsence volants de manoeuvre vannes,PG/TG ok,
no leaks, statut O/F vannes du puits)
sassurer de louverture des vannes du circuit production (en remontant du
manifold vers la tte de puits).
sassurer de la dcompression de lannulaire ventil (EA1).
relever PEA1,2,3.
start chemics injection if necessary (check before Consignes INJECTIONS
CHIMIQUES PUITS ) et warn SDC. Le demarrage de linjection est souvent
realis automatiquement en liaison avec le demurrage de la PCI.
valider lexistence dune vue historique SNCC des parameters de fonctionnement
du puits
We will assume that all the valves on the wellhead are closed.
Check that all drain and purge valves are closed.
Open lower master valve.
Open upper master valve.
Open wing valve (manual) - The status of the wellhead now is that the swab (or
crown) valve is closed. The surface safety valve (second wing valve ) is also
closed. Continue as follows.
17. Lister les squences dun arrt manuel dun puits PCI avec commande de chaque
squence par loprateur de conduite
18. Lister les principaux problmes rencontrs sur un puits PCI pour lequel une
injection chimique est ncessaire.
Point
Prvention des Produit inject Fonction njection sur PCI
well
Limiter dpts
de paraffines +
Paraffines Anti paraffines Aspiration PCI
Dispersant de
paraffines
Rduire la
Emulsions Dsmulsifiant viscosit des Aspiration PCI
mulsions
Limiter dpts
Carbonates Inhibiteur de dpts dans jupe PCI Aspiration PCI
ou dans TBG
Empcher la
Hydrates Inhibiteur dhydrates formation no
dhydrates
Elimination
Bactries Bactricide no
des bactries
Empcher la
Asphaltnes Inhibiteur de dpts formation de Aspiration PCI
dpts
Empcher la Rare
Dpts sulfate
Inhibiteur de dpts formation de
baryum
dpts Aspiration PCI
19. Citer quelques problmes frquents rencontrs sur le fonctionnement dun puits en
gaz lift